Laserfiche WebLink
floodplain may change the base flood elevation or result in a change to the floodplain <br /> map. <br /> 4. PERMIT REQUIREMENTS. No person, firm, corporation, or governmental body not <br /> exempted by law shall commence any development in the floodplain without first obtaining the <br /> required permits from the Zoning Administrator, or other designee. The Zoning Administrator <br /> shall not issue any permits if the proposed development does not meet the requirements of this <br /> ordinance. <br /> A. Permit applications shall be accompanied by: <br /> i. Drawings of the site, drawn to scale showing property line dimensions; <br /> ii. Existing grade elevations and all changes in grade resulting from excavation or <br /> filling; <br /> iii. The location and dimensions of all buildings and additions to buildings; <br /> iv. The elevation of the lowest floor(including basement)of all proposed buildings <br /> subject to the requirements of Section 6; and, <br /> v. Cost of project or improvements as estimated by a licensed professional <br /> engineer, architect or contractor. <br /> B. After receiving a permit application, the Zoning Administrator shall compare the <br /> elevation of the site to the base flood elevation. Any development located on land that <br /> can be shown by survey data to be higher than the current base flood elevation and <br /> which has not been filled after the date of the site's first Flood Insurance Rate Map is <br /> not in the floodplain and therefore not subject to the requirements of this <br /> ordinance. Any development located on land shown by survey elevation to be below <br /> the current base flood elevation is subject to the provisions of this ordinance. In <br /> addition, any development located on land shown to be below the base flood elevation <br />