Laserfiche WebLink
the entire structure must meet the flood protection standards of this section <br /> within twenty-four(24) months of the date the damage occurred; <br /> iv. Installing a manufactured home on a new site or a new manufactured home <br /> to the same site it lawfully occupied before it was removed to avoid flood <br /> damage; <br /> v. Installing a travel trailer or recreational vehicle on a site for more than one <br /> hundred eighty (180) days per calendar year; and, <br /> vi. Repetitive loss to an existing building as defined in Section 1. <br /> B. Existing Residential or Non-Residential Buildings can meet the building protection <br /> requirements by one of the following methods: <br /> i. Buildings may be constructed on permanent land fill in accordance with the <br /> following: <br /> a. The lowest floor (including basement) shall be at or above the <br /> flood protection elevation; <br /> b. The fill shall be placed in layers no greater than six (6) inches <br /> before compaction and should extend at least ten (10) feet <br /> beyond the foundation before sloping below the flood protection <br /> elevation; <br /> C. The fill shall be protected against erosion and scour during <br /> flooding by vegetative cover, riprap, or another approved <br /> structural measures; <br /> d. The fill shall be composed of rock or soil and shall not contain <br /> building debris, vegetation or refuse materials; and <br /> C. Shall not adversely affect the flow of surface drainage from or <br /> onto neighboring properties, and when necessary stormwater <br />