Laserfiche WebLink
i. Any reconstruction, rehabilitation, addition, enlargement or improvement of a structure <br /> during "11fV building <br /> the of the taking place duringa ten (10) year period in which the <br /> lllV 1 <br /> cumulative percentage of improvements: <br /> -17 a. Equals or exceeds twei4y-fe fifty percent ? of the market value of the <br /> structure before the improvement or repair is started; or, <br /> b. Increases the floor area by more than ten twenty percent 04%3 <br /> "Substantial improvement"is considered to occur when the first alteration of any wall, ceiling, <br /> floor or other structural part of the building commences, whether or not that alteration affects the <br /> external dimensions of the structure. This term includes structures which have incurred repetitive <br /> loss or substantial damage, regardless of the actual repair work done. <br /> ii. The term does not include: <br /> 4- a. Projects which are purely for and directly related to the improvement of a <br /> structure to comply with existing state or local health, sanitary, or safety code specifications which <br /> are solely necessary to assure safe living or use of a building; or, <br /> b. Alteration of structures listed on the National Register of Historic Places <br /> or the Illinois Register of Historic Places w-hieh do-not iner-ease-the-size, shape of aim <br /> KK. VIOLATION: The failure of a structure or other development to be fully compliant <br /> with the City's floodplain management regulations. A structure or other development without the <br /> required federal, state, and/or local permits and elevation certification is presumed to be in <br /> violation until such time as the documentation is provided. <br /> LL. ZONING ADMINISTRATOR: The City Mama Director of Economic and <br /> Community Development or his/her designee shall be responsible for the administration of this <br /> Ordinance. <br /> 2. BASE FLOOD ELEVATION. This Ordinance's protection standard is the Base Flood. <br /> The best, most reliable available base flood data are listed below. Whenever a party disagrees with <br />