Laserfiche WebLink
L. Maintain for public inspection base flood data, floodplain maps, copies of State and <br /> Federal permits, and documentation of compliance for development activities subject <br /> to this ordinance; <br /> M. Perform site inspections as needed to ensure compliance with this ordinance and make <br /> substantial damage determinations for structures within the floodplain; and, <br /> N. Maintain the accuracy of floodplain maps including notifying IDNR/OWR and/or <br /> submitting information to FEMA within six months whenever a modification of the <br /> floodplain may change the base flood elevation or result in a change to the floodplain <br /> map. <br /> Additionally,the Zoning Administr-atef shall hm,e the ai;tthefity to make the final determination <br /> to whethef a pafeel of paf eels of land afe within the SF14A. in the event of a dispute, it shall be the <br /> fesponsibilit�, of the owner-(s) to pfevide pfeef as to whethef the subjeet lend is inside ef outside <br /> 4. PERMIT REQUIREMENTS. No person, firm, corporation, or governmental body not <br /> exempted by law shall commence any development in the floodplain without first obtaining the <br /> required permits from the Zoning Administrator, or other designee. The Zoning Administrator <br /> shall not issue any permits if the proposed development does not meet the requirements of this <br /> ordinance. <br /> A. Permit applications shall be accompanied by: <br /> i. Drawings of the site, drawn to scale showing property line dimensions; <br /> ii. Existing grade elevations and all changes in grade resulting from excavation or <br /> filling; <br /> iii. The location and dimensions of all buildings and additions to buildings; <br />