Laserfiche WebLink
Local Public Agency State Contract Day Labor Local Contract RR Force Account <br /> q�) Illinois Department <br /> of Transportation City of Decatur X <br /> Local Public Agency Agreement Section Fund Type ITEP,SRTS,or HSIP Number(s) <br /> for Federal Participation 10-00012-00-MS ITEP 702202 <br /> Construction En ineerin Richt-of-Wa <br /> Job Number Project Number Job Number Project Number Job Number Project Number <br /> C-97-043-17 TE-OOD7(081) <br /> This Agreement is made and entered into between the above local public agency, hereinafter referred to as the"LPA", and the State of <br /> Illinois,acting by and through its Department of Transportation, hereinafter referred to as"STATE". The STATE and LPA jointly <br /> propose to improve the designated location as described below. The improvement shall be constructed in accordance with plans <br /> prepared by, or on behalf of the LPA,approved by the STATE and the STATE's policies and procedures approved and/or required by <br /> the Federal Highway Administration, hereinafter referred to as"FHWA". <br /> Location <br /> Local Name Decatur Corridor Monument Installation Project Route Various Length n/a <br /> Termini Various <br /> Current Jurisdiction Decatur TIP Number DEC16-14 Existing Structure No n/a <br /> Project Description <br /> Installation of way finding and entrance signs along the designated roadways. <br /> Division of Cost <br /> Type of Work ITEP % % LPA % Total <br /> Participating Construction 480,800 ( ) ( ) 120,200 ( Bal ) 601,000 <br /> Non-Participating Construction ( ) ( ) ( ) <br /> Preliminary Engineering ( ) ( ) ( ) <br /> Construction Engineering 61,173 ( * ) ( ) 15,293 ( Bal ) 76,466 <br /> Right of Way ( ) ( ) ( ) <br /> Railroads ( ) ( ) ( ) <br /> Utilities ( ) ( ) ( ) <br /> Materials <br /> TOTAL $ 541,973 $ $ 135,493 $ 677,466 <br /> "80% ITEP Funds NTE$541,973 <br /> NOTE: The costs shown in the Division of Cost table are approximate and subject to change. The final LPA share is dependent on the final Federal <br /> and State participation. The actual costs will be used in the final division of cost for billing and reimbursment. <br /> If funding is not a percentage of the total,place an asterisk in the space provided for the percentage and explain above. <br /> Local Public Agency Appropriation <br /> By execution of this Agreement,the LPA attests that sufficient moneys have been appropriated or reserved by resolution or ordinance <br /> to fund the LPA share of project costs. A copy of the authorizing resolution or ordinance is attached as an addendum(required for <br /> State-let contracts only) <br /> Method of Financing(State Contract Work Only) <br /> METHOD A---Lump Sum(80%of LPA Obligation) <br /> METHOD B--- Monthlv Payments of due by the of each successive month. <br /> METHOD C---LPA's Share Balance divided by estimated total cost multiplied by actual proqress payment. <br /> (See page two for details of the above methods and the financing of Day Labor and Local Contracts) <br /> Printed 4/10/2017 Page 1 of 5 BLR 05310(Rev.09/03/15) <br />