Laserfiche WebLink
Exhibit A <br /> SCOPE OF WORK <br /> The project shall be known as the MCKINLEY AVENUE SEWER REHABILITATION ("Project"). The Project <br /> shall consist of the design of the rehabilitation of the City-owned McKinley Avenue Sewer as outlined in <br /> the City of Decatur's Critical Sewer Rehabilitation Facilities Plan Amendment dated February 2012 by <br /> Bainbridge, Gee, Milanski & Associates, Inc., and as revised by subsequent developments. The project <br /> will be constructed as a single project, and is expected to be funded through the Illinois EPA State <br /> Revolving Fund loan program. <br /> THE CONSULTING ENGINEER AGREES, <br /> 1. Proiect Eneineerine Services - To perform or be responsible for the performance of the <br /> following professional engineering services for the CITY in connection with the design of the <br /> proposed projects hereinbefore described: <br /> a. Make such detailed surveys as are necessary for the preparation of detailed <br /> construction plans. <br /> b. Prepare detailed rehabilitation construction drawings and specifications in such a <br /> manner as to permit the CITY to obtain construction bid prices for the above described <br /> PROJECT. <br /> C. Prepare proposal forms, notice to bidders,and the Contract Documents. <br /> d. Prepare estimate of project construction cost based on final plans and documents. <br /> e. Furnish copies of the Contract Documents consisting of Construction Agreement Forms, <br /> General Conditions, Special Conditions, Detailed Construction Plans and Specifications <br /> for review by the Owner, and for submission to permitting authorities. <br /> f. Incorporate CITY's review comments into the final set of contract documents. <br /> g. Assist the CITY with necessary permit applications to all governmental and other <br /> authorities having jurisdiction to approve portions of the PROJECT such as, but not <br /> limited to, the Illinois Environmental Protection Agency, City of Decatur, Division of <br /> Water Resources, and U.S.Army Corps of Engineers. <br /> h. Provide the CITY with assistance in obtaining project financing utilizing a loan from the <br /> Illinois Water Pollution Control Revolving Fund. <br /> i. Proiect Time of Performance - To complete the engineering design services within 84 <br /> calendar days from the receipt of a "Notice to Proceed"from the CITY. <br /> 2. Proiect Required Provisions <br /> a. The CONSULTING ENGINEER agrees to take affirmative steps to assure that <br /> disadvantaged business enterprises are utilized when possible as sources of supplies, <br /> Last Revised:05-15-2013 A-1 <br />