Laserfiche WebLink
INFORMATION FOR BIDDERS <br /> The Owner reserves the right to pre-qualify all bids, post-qualify all bids, to reject all bids, <br /> not to make an award and/or accept the Proposal deemed most advantageous and to the best <br /> interest of the Owner. The Bidder must comply with all information and instructions for Bidders. <br /> The award of the Contract, if made by the Owner, will be made to the qualified Bidder submitting <br /> the lowest responsive, responsible bid, but the Owner shall determine at their own discretion <br /> whether a Bidder is qualified to perform the Contract, whether by pre-qualifications, post- <br /> qualification or other methods; and what bid is the lowest responsive,responsible bid; and whether <br /> it is to the interest of the Owner to accept the bid. If awarded, a written Notice of Award will be <br /> sent to the successful Bidder. <br /> The Owner will make such investigations as deemed necessary to determine the ability of <br /> the Bidder to perform the work, and the Bidder shall furnish to the Owner all such information and <br /> data for this purpose as the Owner may request. The Owner reserves the right to reject any bid if <br /> the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such <br /> Bidder is properly qualified to carry out the obligations of the Contract and to complete the work <br /> contemplated therein. Conditional bids will not be accepted. <br /> Each bid must be accompanied with a proposal guaranty either as a properly certified <br /> check made payable to "Treasurer, City of Decatur," Decatur, Illinois, in an amount not less than <br /> ten (10) percent of the bid; or a cashier's check made payable to "Treasurer, City of Decatur", <br /> Decatur, Illinois, in an amount not less than ten (10) percent of the bid; or a bid bond on a form <br /> approved by the City, executed by a surety company satisfactory to the City, in an amount not less <br /> than ten (10) percent of the bid. Such proposal guarantees, of the three lowest bidders, may be <br /> retained by the City for a period of 90 days after the date of the bid opening. Checks from other <br /> than the three lowest bidders will be returned by the City within seven (7) days after the date of <br /> the bid opening. Bid bonds will not be returned. <br /> Simultaneously with the delivery of the executed Contract, the Contractor shall furnish a <br /> surety bond or bonds as security for faithful performance of this Contract and for the payment of <br /> all persons performing labor on the project under this Contract and furnishing materials in <br /> connection with this Contract, and other items required by the Conditions and Specifications <br /> governing the work. The surety on such bond or bonds shall be a duly authorized surety company <br /> satisfactory to the Owner. Attorneys-in-fact who sign bid bonds or contract bonds must file with <br /> each bond a certified and effectively dated copy of their Power of Attorney. <br /> ' The successful Bidder, upon Bidder's failure or refusal to execute and deliver the Contract <br /> and bonds required within (10) consecutive calendar days from and including the date the Bidder <br /> has received notice of the acceptance of their bid, shall forfeit to the Owner, as liquidation of <br /> damages done for such failure or refusal, the security deposited with their bid. Notice of the <br /> Owner's intent shall either be hand delivered by the Owner to the Bidder's address, as given on <br /> the Contract Documents, or mailed to such address, first class, United States mail, return receipt <br /> requested. Delivery or mailing of said notice to said address shall constitute the notice herein <br /> required without the requirement of an acknowledgment of receipt from the Bidder. <br /> ' Each Bidder must inform himself fully of the conditions and specifications relating to the <br /> construction of the project and the employment of labor thereon. Failure to do so will not relieve a <br /> successful Bidder of their obligation to furnish all material and labor necessary to carry out the <br /> provisions of the Contract. Insofar as possible, the Contractor, in carrying out their work, must <br /> employ such methods or means as will not cause any interruption of or interference with the work <br /> of any other Contractor. <br /> 8 <br />