My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2017-107 Contract with Kinney Contractors CDBG Sidewalk Improvement Project
COD
>
City Clerk
>
RESOLUTIONS
>
2017
>
R2017-107 Contract with Kinney Contractors CDBG Sidewalk Improvement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2017 3:57:53 PM
Creation date
9/6/2017 3:57:43 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2017-107
Res Ord Title
Contract with Kinney Contractors, Inc. for CDBG Sidewalk Improvement Project City Project 2017-21
Department
Public Works
Approved Date
9/5/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL CONDITIONS <br /> GC-16 METHOD OF PAYMENT(continued) <br /> Lien waivers will be required on a weekly basis. <br /> GC-17 NO PARKING SIGNS <br /> The Engineering Division will erect "No Parking" signs 24 hours prior to the start of <br /> work on a street, in an attempt to have all vehicles removed from the street. The City will not be <br /> held responsible for any delays due to the City having to have parked vehicles moved. The <br /> Contractor shall furnish the Engineer with suitable hardwood quality lath (drawing contained in <br /> these specifications) and a suitable quality and quantity of paint to erect "No Parking" signs, and <br /> to mark utilities. This cost will be considered incidental to the contract. <br /> GC-18 PERMITS <br /> It is the Contractor's responsibility to obtain all necessary permits. Any costs incurred in <br /> obtaining these permits are to be incidental to the related contract item. Permit fees will be <br /> waived for those permits issued by the City of Decatur. <br /> GC-19 DOCUMENTATION OF EXISTING CONDITIONS <br /> The Contractor shall provide digital video and/or detailed photographs of existing <br /> facilities along the route or area of all construction, prior to the start of such construction. <br /> Construction of this facility will generally be along street right-of-way containing trees, bushes, <br /> fences, driveways and similar items. Special attention shall be given to coverage of the entire <br /> easement and immediate adjacent areas which might be disturbed during construction. <br /> The video and/or photographs shall be adequate to serve as a basis for comparison in <br /> determining whether the terms of the specifications with respect to replacements, restoration <br /> and/or preservation of existing surfaces have been complied with. Copy(s) of the video and/or <br /> photographs taken shall be given to the Engineer for his files. The cost for this item shall be <br /> included in the respective prices for the various items of work. <br /> GC-20 PREVAILING WAGE RATES <br /> The Contractor shall supply all weekly prevailing wage documentation, (weekly <br /> certified payroll) for both the prime Contractor and their subcontractors through ePrismSoft, an <br /> electronic web based compliance tracking software and further comply with all governing <br /> Federal, State and Local rules and policies regarding Davis Bacon Wage Decision. The City will <br /> monitor the payroll for compliance with the applicable "Davis Bacon wage rates" as required by <br /> the Special Conditions of this contract. <br /> Access to ePrismSoft has been furnished by the City of Decatur. To activate access, the Prime <br /> Contractor and all subcontractors are to contact Human Capital Development at <br /> webnfogeprismsoft.com or(309) 692-6400. <br /> 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.