Payment terms are 30 days from invoice date unless otherwise
<br /> Sales and agreed upon in writing.
<br /> Remit To:Cummins Crosspoint
<br /> vi
<br /> Serce 75 Remittance Dr-Ste1701
<br /> Chicago,IL 60675-1701
<br /> NORMAL BRANCH INVOICE ,NO
<br /> 450 W NORTHTOWN ROAD
<br /> NORMAL, IL 61761- ESTIMATE
<br /> (309)452-4454
<br /> Remit Ta:75 Remittance Dr-Ste17o1
<br /> Chicago,IL 60675-1701
<br /> BILL TO OWNER
<br /> CITY OF DECATUR DECATUR MASS TRANSIT
<br /> PUBLIC TRANSIT 555 EAST WOOD PAGE 2 OF 7
<br /> 555 EAST WOOD ST DECATUR, IL 62523- ***CHARGE***
<br /> DECATUR, IL 62523- CHRIS BERGSCHNEIDER-217 424-2816
<br /> DATE CUSTOMER ORDER NO. DATE IN SERVICE ENGINE MODEL PUMP NO. EQUIPMENT MAKE
<br /> 21-OCT-2017 10:45AM 19-NOV-2001 ISC-280-BUS GILLIG
<br /> CUSTOMER NO. SHIP VIA FAIL DATE ENGINE SERIAL NO. CPL NO. EQUIPMENT MODEL
<br /> 62523 17-OCT-2017 46153491 CPL223600 PHANTOM
<br /> REF.NO. SALESPERSON PARTS DIST. MILEAGEIHOURS PUMP CODE UNIT NO.
<br /> 191093 02643721 9104
<br /> PRODUCTQUANTITY BACK QUANTITY PART
<br /> ORDERED I OROERED1 SHIPPED I NUf3BER DESCRIPTION CODE UNIT PRICE AMOUNT
<br /> OSN/MSN/VIN 11090435 YEAR 1
<br /> GASKETS AND SEALS,TORQUE ALL TO SPEC.INSTALL NEW OIL COOLER,NEW
<br /> OIL PUMP,RECON FUEL PUMP,RECON AIR COMPRESSOR,RECON INJECTORS,
<br /> NEW PUSH TUBES,ROCKER LEVERS AND GEARS,TIME AND TORQUE ALL TO
<br /> SPEC.INSTALL NEW FRONT COVER,CRANK SEAL,NEW DAMPER,NEW WATER
<br /> PUMP,TORQUE ALL TO SPEC.INSTALL EXHAUST MANIFOLD,RECON TURBO,
<br /> OIL SUCK TUBE,OIL PAN,INJECTOR TUBES,FUEL LINES,FLYWHEEL HOUSING
<br /> AND FLYWHEEL,TORQUE ALL TO SPEC.FINISH ENGINE REASSEMBLE,BOLT UP
<br /> TRANSMISSION.INSTALL ENGINE AND TRANSMISSION WITH NEW CUSTOMER
<br /> SUPPLIED ENGINE MOUNTS.INSTALL REMOVED EXTERNAL ENGINE
<br /> ACCESSORIES,HOOK UP TRANSMISSION AND DRIVELINE.CLEAN INTAKE
<br /> PIPING,HOOK UP CAC AND COOLANT PIPING.CHANGE WET FILTERS,FILL
<br /> ENGINE OIL AND PURGE.SET ENGINE OVERHEAD,INSTALL VALVE COVER.
<br /> HOOK UP ALL ELECTRICAL,FILL COOLANT.START AND RUN.CHANGE AIR
<br /> FILTER ELEMENT,HOOK UP INTAKE PIPING,FINISH BUS HOOKUP,INSTALL
<br /> REAR BUMPER AND ENGINE COVER AND REAR SEAT.STEAM OFF REPAIRS,
<br /> DYNO FOR BREAK IN.UNHOOK FROM DYNO,ROAD TEST.CHECK OVER
<br /> REPAIRS FOR LEAKS,TOP OFF FLUIDS.
<br /> REMARK CUSTOMER TO SUPPLY ALL OEM ITEMS IN NEED OF REPLACEMENT,ENGINE
<br /> MOUNTS,BELTS,PIPING,HOSES ETC.
<br /> 1 0 3918986 CRANKSHAFT,ENGINE W/GEAR CECO 1,728.14 1,728.14
<br /> 1 0 3945917 SET,MAIN BEARING(STD) CECO 174.63 174.63
<br /> 6 0 3800319 KIT,CYLINDER CECO 288.29 1,729.74
<br /> 12 0 3950661 BEARING,CON ROD(STD) CECO 8.84 106.08
<br /> 1 0 3901969 PLUG,EXPANSION CECO 5.70 5.70
<br /> 1 0 3926048 SEAL,O RING CECO 4.30 4.30
<br /> 1 0 5283368 BUSHING CECO 12.06 12.06
<br /> 1 0 3901383RX ROD,CONN 6C DRC 83.64 83.64
<br /> Completion date:31-Oct-2017 02:5813M. Estimate expires:16-Nov-2017 01:58PM.
<br /> Billing Inquiries?Call(877)480-6970 or email CBSCrossPointReceivabies@cummins.com
<br /> THERE ARE ADDITIONAL CONTRACT TERMS ON THE REVERSE SIDE OF THIS
<br /> DOCUMENT,INCLUDING LIMITATION ON WARRANTIES AND REMEDIES,WHICH ARE
<br /> EXPRESSLY INCORPORATED HEREIN AND WHICH PURCHASER ACKNOWLEDGES HAVE
<br /> BEEN READ AND FULLY UNDERSTOOD.
<br /> AUTHORIZED BY(print name) SIGNATURE DATE
<br />
|