Laserfiche WebLink
Bwk: 4558 Page: 4915 <br /> September 30, 2015 <br /> Mr.Billy Tyus <br /> Focused Phase 11 ESA- 151 West Main Street/152 West Wood Street <br /> Page 2 <br /> There is a potential for release from any chemical storage in the courtyard where the <br /> 55-gallon drum was found on the Property that could negatively impact underlying soil <br /> and groundwater. <br /> Adiacent Property <br /> • There is potential for release of petroleum products from the historical UST used at <br /> 160 West Main Street that could negatively impact underlying soil and groundwater at <br /> the Property. <br /> • There is potential for release of petroleum products from the historical UST used at <br /> 105-123 East Wood Street that could negatively impact underlying soil and <br /> groundwater at the Property. <br /> • There is potential for release of petroleum products from the historical UST used at <br /> 201-235 East Wood Street that could negatively impact underlying soil and <br /> groundwater at the Property. <br /> CREC <br /> There is potential for migration from the historical release of contamination located <br /> 266 West Main Street to the Property that could negatively impact underlying soil and <br /> groundwater. <br /> The ASTM El 527-13 Phase I ESA Standard defines a REC as "the presence or likely presence of <br /> any hazardous substances or petroleum products in, on, or at a property: (1)due to release <br /> to the environment; (2)under conditions indicative of o release to the environment;or(3) <br /> under conditions that pose a material threat of a future release to the environment." <br /> The objective of this Phase II ESA was to determine if soil and/or groundwater on the Property <br /> had been negatively impacted by the aforementioned RECs by comparing detected parameters <br /> to the established 35 Illinois Administrative Code(IAC)Part 742, Tiered Approach to <br /> Corrective Action Objectives(TACO)Tier 1 soil remediation objectives (SROs)for <br /> Industrial/commercial land use (current/future proposed Property land use); the most <br /> stringent groundwater remediation objectives(GROs)for Class I Groundwater; and the Tier 1 <br /> GROs for the Indoor Inhalation Exposure Route-Diffusion and Advection(Tables I and H) . <br /> FIELD ACTIVITIES <br /> On September 16-18,2015,Ms. Erica Toledo of Fehr Graham mobilized to the Property to <br /> oversee and conduct site investigation activities with two(2)field staff members from Earth <br /> Solutions, Inc. (Earth Solutions),the drilling contractor procured by Fehr Graham. Prior to <br /> drilling activities, Earth Solutions initiated a Joint Utility Locating Information for Excavators <br /> (JULIE)request to identify any public underground utilities in the vicinity of the investigation <br /> areas.Site conditions September 16-18 consisted of partially clear skies with moderate <br /> humidity and an average temperature of approximately 70-80 degrees Fahrenheit. Under the <br /> direction of Fehr Graham staff, Earth Solutions conducted a total of nine(9)soil borings(SBI <br /> through SB9)for soil sampling purposes and installed three(3)temporary groundwater <br /> monitoring well (TWi-TW3)for groundwater sampling at pre-selected locations on the <br />