Laserfiche WebLink
BuOk: 4558 Page: 508 <br /> EHR GR�'.i:.� BORING NUMBER SB3 <br /> PAGE 1 OF 1 <br /> ENGINEERING&ENVIRONMENTAL <br /> CLEW City of Decatur PROJECT NAME Tick Properties <br /> PROJECT NUMBER 12-139H A03M PROJECT LOCATION 151 West Actin Street/142 West Wood Street <br /> DATE STARTED 9/16/15 COMPLETED 9/16/15 GROUND ELEVATION HOLE SIZE 2" <br /> DRILLING CONTRACTOR Earth Solutions GROUND WATER LEVELS: <br /> DRILLING METHOD Geoprobe 420M Hand Cart Marxo•Core Samder AT TIME OF DRILLING — <br /> LOGGED BY Erica Toledo CHECKED BY Joel Zirlde AT END OF DRILLING <br /> NOTES AFTER DRILLING — <br /> wlz ;e <br /> x <br /> w 9 !g wo y k MATERIAL DESCRIPTION o <br /> a zw c� a <br /> w o: <br /> 0-5 Concrele <br /> 297 <br /> Light brown to Wt gray sandy day,soft,high*s&* <br /> MAC 33 <br /> CH 761 <br /> 5 886 <br /> MAC 100 6.0 655 <br /> Light down sandy day,very dense,krw Plasticity,wet at 9 bgs. 958 <br /> 879 <br /> 824 <br /> 10 10.0 768 <br /> MAC 100 Okve gray day with sand,moist to wet. 1500( <br /> CL 262 <br /> 13.0 56.2 <br /> Hand cart reftrsol at 13 b9s. <br /> Bottom of hole at 13.0 feet. <br /> V <br /> a <br /> 0 <br /> d <br /> n <br /> 0 <br /> 0 <br /> 0 <br /> W <br /> n3 <br /> F <br /> i <br /> CO <br /> 2 <br /> W <br /> O <br />