My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-15 Professional Engineering Services Agreement Farnsworth Group Design Storm Drainage Improvements 32nd - Fulton Area
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-15 Professional Engineering Services Agreement Farnsworth Group Design Storm Drainage Improvements 32nd - Fulton Area
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2018 4:16:39 PM
Creation date
2/6/2018 4:16:37 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2018-15
Res Ord Title
Professional Engineering Services Agreement with Farnsworth Group to Design Storm Drainage Improvements 32nd - Fulton Area City Project 2016-04
Department
Public Works
Approved Date
2/5/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Not included in this Contract and Scope of Services: <br /> • Topographic or Property surveying beyond that listed above. <br /> • Potable Water/Sanitary Sewer studies or design <br /> • Traffic Impact Studies or Roadway Design <br /> • Attendance or presentation at Planning and Zoning or City Council <br /> Meetings <br /> • IEPA Permitting <br /> • Permit Fees. <br /> • Geophysical or Environmental Investigations <br /> • IDNR or Corps of Engineers Permitting <br /> • FEMA Letters of Map Revision or Detailed Flood Studies or Mapping <br /> • IDOT Coordination or Permitting <br /> • Construction Administration or Observation. <br /> If necessary, FGI can perform these extra services on a time and material basis under a <br /> separate contract addendum if requested by the Client. <br /> Estimated Project Schedule: <br /> Contract Awarded by City Council February 5, 2018 <br /> Project Kickoff February 12, 2018 <br /> Surveying Completed March 30, 2018 <br /> Preliminary Modeling/Analysis Results May 15, 2018 <br /> Presented <br /> Preliminary Plan Presented for Approval June 15, 2018 <br /> 95% Construction Plans Provided for Review August 15, 2018 <br /> Final Construction Plans Presented September 14, 2018 <br /> Advertise for Bid October 1, 2018 <br /> Contract Awarded November 5, 2018 <br /> Last Revised:04/29/2015 A - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.