Laserfiche WebLink
preliminary engineering design of the storm drainage in the 32nd and Fulton area of the City and <br /> providing recommendations for future actions. Farnsworth is an engineering firm located in Central <br /> Illinois and has a branch office in the City. <br /> The 32"d/Fulton Drainage Improvement Project is entering phase 2 of 3 phases: <br /> 1. Preliminary Drainage Design: This project was completed in late 2017. This phase provided <br /> a review of the area storm drainage system, or lack thereof, and prepared an action plan to <br /> address identified problems. The Executive Summary is attached for Council review. <br /> 2. Final Design: Based on the results of the preliminary review, Farnsworth has prepared a <br /> scope of services to design the proposed drainage projects. The proposed area improvements <br /> are shown on the attached location map. <br /> 3. Construction Phase: It is anticipated that construction will begin in early 2019. This work <br /> was moved up in the 2018 Capital Improvement Plan to coordinate with the City's planned <br /> sanitary sewer improvements affecting the Lost Bridge North Area. <br /> Engineering Services Agreement <br /> The scope of services for the second phase of the 32nd and Fulton Area Storm Drainage Improvement <br /> Project includes: <br /> I. Hold public meetings with the residents of the 32nd/Fulton drainage area and other stake <br /> holders, including area businesses,to review proposed improvements in the drainage area. <br /> 2. Perform topographical survey of the area of the proposed improvements. <br /> 3. Design proposed improvements with input from area residents and property owners. <br /> 4. Prepare plans and specifications for the proposed drainage improvements. <br /> 5. Provide bidding assistance to the City, including responding to questions,reviewing bids and <br /> recommending the award. <br /> POTENTIAL OBJECTION: None <br /> INPUT FROM OTHER SOURCES: Farnsworth Group, Inc. <br /> STAFF REFERENCE: Richard Marley, Public Works Director and Matt Newell, City Engineer. <br /> Matt Newell will be in attendance at the City Council meeting to answer any questions of the Council <br /> on this item. <br /> LEGAL REVIEW: The proposed agreement was approved by the Legal Department on Thursday, <br /> January 25, 2018. <br /> SCHEDULE: <br /> Work on the Final Design is scheduled to begin immediately and be completed and submitted for <br /> review by December of this year. Draft results will be available for use in the preparation and <br /> development of the 2018 Capital Improvement Plan. Construction is planned to begin in 2019. <br /> BUDGET IMPLICATIONS: <br /> — 2 — <br />