My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-13 Professional Services Agreement AECOM for Ellen and Division Inflow and Infiltration Reduction
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-13 Professional Services Agreement AECOM for Ellen and Division Inflow and Infiltration Reduction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2018 4:28:46 PM
Creation date
2/6/2018 4:28:42 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2018-13
Res Ord Title
Approve Professional Services Agreement with AECOM Technical Services, Inc. for Ellen and Division Inflow and Infiltration Reduction Project City Project 2018-01
Department
Public Works
Approved Date
2/5/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A.�M 303 E.Wacker or. Exhibit A-1 <br /> Suite 1400 <br /> Chicago,IL 60601 <br /> 312-373-7700 tel <br /> January11, 2018 <br /> Paul Caswell, PE <br /> Assistant City Engineer <br /> City of Decatur Public Works Department <br /> #1 Gary K Anderson Plaza-3rd Floor <br /> Decatur, Illinois 62523 <br /> Regarding: Ellen and Division—Inflow and Infiltration(181) Program <br /> Scope of Work <br /> Dear Mr. Caswell: <br /> AECOM Technical Services, Inc. (AECOM) is pleased to provide this scope of work(Scope)for the <br /> above-referenced project. This Scope encompasses AECOM's engineering and field services for the <br /> subject project. Note that a detailed breakdown of task costs and a schedule is included in this <br /> Scope. <br /> Background <br /> The City is currently under Administrative Consent Order (ACO) by the United States Environmental <br /> Protection Agency (USEPA). The ACO requires a reduction in basement backups within the City's <br /> combined and sanitary sewer system, as well as the elimination of all unauthorized Combined Sewer <br /> Overflows (CSOs)and Sanitary Sewer Overflows (SSOs). <br /> In order to demonstrate compliance with the ACO, the City was required to submit a Sewer Collection <br /> System Alternatives Analysis (SCSAA). In partnership with AECOM, the SCSAA (and subsequent <br /> revisions)were submitted on April 12, 2016, November 4, 2016, and November 30, 2017. <br /> As a part of this work, it became clear that the reoccurring SSOs at Manhole No. 10-13 in the Ellen <br /> and Division area (see attached Figure A) could not be eliminated through regular maintenance. <br /> Therefore, additional study is needed to eliminate this SSO, either by reducing 1/1 or removing <br /> hydraulic deficiencies(or both). <br /> SCOPE OF WORK <br /> Our scope of work will be as follows: <br /> Task 1: HYDRAULIC AND HYDROLOGIC MODELING <br /> The purpose of this task is to perform hydrologic and hydraulic modeling of the Ellen and Division <br /> study area. This modeling will be used to better understand performance of the local sewer collection <br /> system and assess options to prevent the reoccurring SSOs at Manhole No. 10-13, as well as any <br /> other manholes for which the model predicts SSOs. A hydraulic model of the drainage collection <br /> system will be developed using the Personal Computer Storm Water Management Model(PCSWMM) <br /> package. AECOM has previously used PCSWMM to analyze other reaches of the City of Decatur <br /> collection system, including Basins 5 and 6. <br />
The URL can be used to link to this page
Your browser does not support the video tag.