Laserfiche WebLink
§11.2 For Additional Services designated in Section 4.1,the Owner shall compensate the Architect as follows: <br /> (Insert amount of or basis for,compensation.If necessary,list specific services to which particular methods of <br /> compensation apply.) <br /> Building Information Modeling=Included in Basic Services <br /> Civil Engineering=Twenty One Thousand Six Hundred dollars($21,600.00) <br /> Landscape Design-Seven Thousand Five Hundred dollars($7,500.00) <br /> Architectural Interior Design=Included in Basic Services <br /> Detailed Cost Estimating=Eleven Thousand Three Hundred Thirty dollars($11,330.00) <br /> Technology Services=Thirteen Thousand dollars($13,000.00) <br /> Geotechnical Engineering-Three Thousand Six Hundred dollars($3,600.00) <br /> Boundary and Topographic Survey Three Thousand Eight Hundred Eighty Nine dollars($3,889.00) <br /> §11.3 For Additional Services that may arise during the course of the Project,including those under Section 4.3,the <br /> Owner shall compensate the Architect as follows: <br /> (Insert amount of or basis for,compensation) <br /> Hourly basis in accordance with attached Architect's Standard Hourly Rates,or as negotiated. <br /> §11.4 Compensation for Additional Services of the Architect's consultants when not included in Section 11.2 or <br /> 11.3,shall be the amount invoiced to the Architect plus fifteen percent ( 159'0 ),or as otherwise stated below: <br /> §11.5 Where compensation for Basic Services is based on a stipulated sum or percentage of the Cost of the Work, <br /> the compensation for each phase of services shall be as follows: <br /> Schematic Design Phase percent { 5 %) <br /> Design Development Phase percent t 33 %) <br /> Construction Documents percent ; 27 %) <br /> Phase <br /> Bidding or Negotiation Phase percent ( 5 %) <br /> Construction Phase percent ( 30 %) <br /> Total Basic Compensation one hundred percent ( 100 %) <br /> (Table Deletedi <br /> §11.6 When compensation is based on a percentage of the Cost of the Work and any portions of the Project are <br /> deleted or otherwise not constructed,compensation for those portions of the Project shall be payable to the extent <br /> services are performed on those portions,in accordance with the schedule set forth in Section 11.5 based on(1)the <br /> lowest bona fide bid or negotiated proposal,or(2)if no such bid or proposal is received,the most recent estimate of <br /> the Cost of the Work for such portions of the Project.The Architect shall be entitled to compensation in accordance <br /> with this Agreement for all services performed whether or not the Construction Phase is commenced. <br /> §11.7 The hourly billing rates for services of the Architect and the Architect's consultants,if any,are set forth <br /> below.The rates shall be adjusted in accordance with the Architect's and Architect's consultants'normal review <br /> practices. <br /> (If applicable,attach an exhibit of hourly billing rates or insert them below.) <br /> See attached Architect's Standard Hourly Rates. <br /> tlt� AIA Document 8101'—2007(formerly B161" —1997).Copyright O 1974,1978,1987,1997 and 2007 by The American Institute of Architeds.All rights <br /> reserved.WARNING.This AIA' Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of 17 <br /> this AIAe Document,or any portion of H,may result in severe civil and criminal penalties and will be prosecuted to the maximum extent possible <br /> t under the law This dmumard was produced by AIA software at 17:03:54 on 01/3112018 under Order No.4966021632 which expires on 0411112018,and is not <br /> for resale. <br /> User Notes: (389ADA17) <br />