Laserfiche WebLink
City of Decatur <br /> January 30,2017 <br /> Page 3 of 9 <br /> Report of Data Obtained <br /> Upon completion of sampling and testing,you will receive an engineering report summarizing field and <br /> laboratory test data,including a boring location plan and computer generated boring logs.The report will <br /> address anticipated soil and groundwater conditions impacting site development,based upon the <br /> information obtained from the borings.The report will also provide recommendations to guide design and <br /> specification preparation pertaining to geotechnical issues relevant to the structure or purpose described <br /> in this proposal.These may include the following: <br /> • General earthwork and construction considerations. <br /> • Remedial work and/or treatment of unstable or unsuitable soil types. <br /> • Fill placement and compaction requirements for the structure and pavements <br /> • Foundation type,capacity and depth(elevation) <br /> • Protective measures required for frost action. <br /> • Lateral earth pressures for below grade walls <br /> • Seismic design criteria <br /> Assumptions: None <br /> Exclusions: Architect,Landscape Architect,Mechanical,Electrical,Plumbing,Technology/Security, <br /> and Civil Engineering <br /> Deliverables: Electronic Files in PDF,TIFF,and/or JPG format <br /> Price: Reference Price and Payment <br /> Schedule: Completed within 4 weeks of the start of Task 3. <br /> Task 3: Schematic Design <br /> The Architect will perform the following during Schematic Design.Reference AIA contract Blol—2007 <br /> for additional information. <br /> •Manage the design team <br /> •Create a proposed Design schedule that is mutually agreed upon by the Owner <br /> •Coordination of the MEP/T,Landscape Architect,and Civil Engineering work <br /> •Review concept fire station design with the Owner <br /> •Coordination of detailed Cost Estimate <br /> Assumptions: Assumed Concept Fire Station design is the starting document for the schematic design of <br /> Fire Station 5. <br /> Exclusions: Furniture,Furnishings and Equipment(by owner),Re-Design of the concept fire station. <br /> Deliverables: MEP/T, and Landscape schematic design narrative, Architectural plans, elevations and <br /> basic wall section and cost estimate <br /> Dewberry Scope of Work Fire Station 5—City of Decatur <br />