My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-44 Execution a Contract with Dunn Co. for 2018 Local Motor Fuel Tax Street Improvements CP 2018-25
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-44 Execution a Contract with Dunn Co. for 2018 Local Motor Fuel Tax Street Improvements CP 2018-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:24:41 PM
Creation date
6/4/2018 11:31:54 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2018-44
Res Ord Title
Contract with Dunn Company for 2018 Local Motor Fuel Tax Street Improvements City Project 2018-25
Department
Public Works
Approved Date
5/7/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />' 2018 Local Motor Fuel Tax <br /> Street Improvement Project <br /> City Project 2018-25 <br /> April 23, 2018 <br />' ADDENDUM NO. 1 <br /> TO PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS FOR: <br /> 2018 LOCAL MOTOR FUEL TAX <br /> STREET IMPROVEMENT PROJECT <br /> CITY PROJECT 2018-25 <br />' DATED APRIL 23,2018 <br /> AD-1-1 NOTICE <br />' 1.01 This Addendum No. 1 dated April 23,2018,to the Plans, <br /> Specifications and Contract Documents for the above captioned <br /> project, supersedes all contrary and conflicting information of the <br /> above mentioned bid proposal documents, which are hereby <br /> supplemented in certain particulars as follows: <br />' AD-1-2 BID PROPOSAL <br /> 2.01 Insert the attached pre-bid meeting sign-in sheet and meeting <br />' minutes from the Pre-Bid Meeting on April 18,2018. <br /> 2.02 Replace the Subcontractor Utilization Statement on Page 22 with <br /> the pages included with this addendum. <br />' AD-1-3 SPECIAL PROVISIONS AND STANDARD SPECIFICATIONS <br />' 3.01 Insert the following Special Provision, SP-19, into the Special <br /> Provisions and Standard Specifications on page 61. <br /> SP-19 SIDEWALKS, CURBS,AND CURB RAMPS <br /> Description: All sidewalks,and curb ramps must be replaced and open to <br /> pedestrian traffic within 7 calendar days of removal. <br /> Basis of Payment: This work will not be paid for separately but shall be <br /> considered as included with the various work items involved. <br />' Please make the proper acknowledgment of addenda#1 on page 15 of your <br /> bidding documents. <br /> END OF ADDENDUM NO. 1 <br /> d 3d <br /> City En ineer: � Date: v� <br />
The URL can be used to link to this page
Your browser does not support the video tag.