My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-44 Execution a Contract with Dunn Co. for 2018 Local Motor Fuel Tax Street Improvements CP 2018-25
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-44 Execution a Contract with Dunn Co. for 2018 Local Motor Fuel Tax Street Improvements CP 2018-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:24:41 PM
Creation date
6/4/2018 11:31:54 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2018-44
Res Ord Title
Contract with Dunn Company for 2018 Local Motor Fuel Tax Street Improvements City Project 2018-25
Department
Public Works
Approved Date
5/7/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' CITY OF DECATUR <br /> SPECIAL PROVISIONS <br /> tSP-16 AMERICAN REDBUD TREE <br /> Description: This work includes the planting of new 2 inch diameter American Redbud <br /> Trees (Cercus Canadasis) as well as using good organic dirt as backfill topped with 2 inches of <br /> river rock. The trees must be watered until the tree is established. The contractor will replace any <br /> tree that dies either before the tree is established or before 1 year after planting,whichever is <br /> longer. <br /> Basis of Payment: All labor, materials, and warranty necessary to complete this work <br />' will be paid for at the contract unit price per EACH for AMERICAN REDBUD TREE, <br /> (CERCUS CANADASIS)2". <br />' SP-17 ALTERNATE STREETS <br /> This project contains a list of alternate streets that may or may not be chosen as part of <br />' the final project. The City may also choose any portion of any of the alternate streets to be <br /> included in the final project without necessarily including the entire length of the street as <br /> defined in the project location and on the location map. The cost of a portion of a street will be <br />' based on the unit prices provided for that alternate location. The City will convey which alternate <br /> locations and what portions of those locations were chosen to the Contractor in writing along <br /> with adjusted quantities. <br />' SP-18 PARKING LOT ISLAND POSTS <br />' Description: If parking posts can be salvaged when removing the island in the <br /> Downtown Alley,they shall be re-installed in the new island such that they will be centered in <br /> front of each parking stall. If the posts cannot be salvaged,the City will provide new posts to be <br />' installed. <br /> Basis of Payment: Cost of the work will not be paid for separately but shall be <br />' considered as included with the various work items involved. <br /> SP-19 SIDEWALKS,CURBS,AND CURB RAMPS <br />' Description: All sidewalks, and curb ramps must be replaced and open to pedestrian <br /> traffic within 7 calendar days of removal. <br /> Basis of Payment: This work will not be paid for separately but shall be considered as <br /> included with the various work items involved. <br />' END <br /> CITY OF DECATUR <br />' SPECIAL PROVISIONS <br />' 61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.