My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-44 Execution a Contract with Dunn Co. for 2018 Local Motor Fuel Tax Street Improvements CP 2018-25
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-44 Execution a Contract with Dunn Co. for 2018 Local Motor Fuel Tax Street Improvements CP 2018-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:24:41 PM
Creation date
6/4/2018 11:31:54 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2018-44
Res Ord Title
Contract with Dunn Company for 2018 Local Motor Fuel Tax Street Improvements City Project 2018-25
Department
Public Works
Approved Date
5/7/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Decatur, Illinois RETURN WITH BID <br />' #1 Gary K. Anderson Plaza <br /> Decatur, IL 62523-1196 Subcontractor Utilization Statement <br />' Date: April 26, 2018 Project Title: 2018 Local Motor Fuel Tax Street Improvement Project <br /> Total Contract Value: $ -x`5-,85 Project Number: 2018-25 <br /> Section I: Prime Contractor Information <br />' Prime Contractor: Dunn Company,A Division of Tyrolt, Inc. <br /> 724 N. Mercer St. <br />' Address: <br /> Decatur, IL 62522 <br /> Phone: 217-429-4444 <br />' Contact Person: David W. Tyrolt <br />' Email: david.tyrolt@dunnco.com <br /> *Amount and%of Total Contract based on Base Bid <br /> Section II: Selected Subcontractors <br />' Subcontractor Name MBE or Amount* %of Total Scope of Work <br /> Non-MBE Contract* <br /> Marenco Enterprises MBE $13,200.00 0.74% Trucking <br /> S. Drain Engineering MBE $11,000.00 0.62% Field mix design,field testing,final report <br />' Woo Woo and Jo Jo, Inc MBE $4,050.00 0.23% Trucking <br /> Valve box, manole, and catch basin <br /> Burdick Plumbing and Heating Co, Inc. Non MBE $96,480.00 5.42% adjustments <br />' CNS Forestry Non-MBE $4,565.00 0.26% Tree removal and planting <br /> Kinney Contractors, Inc. Non-MBE $528,217.90 29.70% Concrete removal and replacement <br /> Varsity Striping Non-MBE $11,755.10 0.66% Thermoplastic pavement marking <br /> Totals $669,268.00 37.63% <br />' • If more subcontractors are utilized, please copy this form and attach the additional information. <br /> Section III: MBE subcontractors that submitted bids but were not selected <br /> Subcontractor Name Scope of Work Bid Reason for Denial <br /> D2K Traffic Equipment and Design, LLC Thermoplastic pavement markings Was not lowest responsible bidder. <br />' Did not posess necessary qualifications to <br /> Euroclydon, Inc. Concrete sidewalk removal and replacement enable selection as a subcontractor <br /> Veya, Inc. Concrete sidewalk removal and replacement Was not lowest responsible bidder. <br /> t <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.