f,
<br /> Hfinols Department Affidavit of Availability
<br /> of Transportation For the Letting of 5/23/2018
<br /> (Letting date)
<br /> Bureau of Construction
<br /> 2300 South Dirksen Parkway/Room 322 Instructions: Complete this form by either typing or using black ink.
<br /> Springfield,Illinois 62764 "Authorization to Bid"will not be issued unless both sides of this form are
<br /> S ..
<br /> completed in detail. Use additional forms as needed to list all work.
<br />' Part I. Work Under Contract
<br /> List below all work you have under contract as either a prime contractor or a subcontractor. It is required to include all pending low bids not yet awarded or
<br /> .rejected. In a joint venture,list only that portion of the work which is the responsibility of your company. The uncompleted dollar value is to be based upon the most
<br /> r:cent engineer's or owners estimate,and must include work subcontracted to others. If no work is contracted,show NONE.
<br /> 1 2 3 4
<br /> Awards Pending
<br /> r �ntract Number ISTHA e#RR-13- a au LaSalle- Cook
<br /> ! 4116 Airport Brookfield Schaumburg
<br /> f�ntract With Walsh Const. R.W.Dunteman Brookfield Plote Const.
<br /> ,'Almated Completion Date 10-31-19 6-30-18 10-31-18 7-15-18
<br /> Total Contract Price 216,387.00 32,523.00 11,018.00 31,756.00 Accumulated Totals
<br /> Uncompleted oar Vairu—e—ifrirm is the
<br /> o. 8,318.00 105,058.00
<br /> ncomp e e oar Value if Firm is the
<br /> 1: 216,387.00 32,523.00 2,000.00 498,235.00
<br /> Total Value of All Work 603,293.00
<br />'Part It. Awards Pending and Uncompleted Work to be done with your own forces.
<br /> List below the uncompleted dollar value of work for each contract and awards pending to be completed with your own forces. All work Accumulated
<br /> 3ubcontracled to others will be listed on the reverse of this form. Ina joint venture,list only that portion of the work to be done by your
<br />' mpany. If no work is contracted,show NONE. Totals
<br /> IfEarthwork 0.00
<br /> trtland Cement Concrete Paving 0.00
<br /> EAA Plant Mix 0.00
<br /> N'.1-1AA Paving 0.00
<br /> !✓lean&Seal Cracks/Joints 0.00
<br /> Aggregate Bases 8,Surfaces 0.00
<br /> 'Ighway,R.R.and Waterway Structures 0.00
<br /> r
<br /> )rainage 0.00
<br /> Electrical 0.00
<br /> ^.over and Seal Coats 24,000.00
<br /> >oncrete Construction 0.00
<br /> :Grooving 21,477.00 21,477.00
<br /> 4?Ised Reflectors 26,466.00 51,383.00
<br /> `,ury Application 8,318.00 78,558.00
<br /> -inting 0.00
<br /> Disc.TC&Mob. 27,808.00
<br /> Misc.Pvt.Mrk. 34,421.00 34,421.00
<br /> 5avement Markings(Paint) 2,000.00 2,000.00
<br /> ' Avement Markings(Urethane) 7,265.00
<br /> Pavement Markings(Thermo) 12,205.00 1 1 1117,776.00
<br /> Pavement Mkgs(Epoxy) 118,613.00 32,523.00 228,911.00
<br /> pavement Markings(Polyurea) 3,205.00 9,694.00
<br /> r itals 216,387.00 32,523.00 8,318.00 2,000.00 0.00 603,293.00
<br /> 7isclosure of this information is REQUIRED to accomplish the statutory purpose as outlined in the"Illinois Procurement Code". Failure to comply will result
<br /> non-issuance of an"Authorization To Bid." This form has been approved by the State Forms Management Center.
<br /> Printed 5/18/2018 BC 57(08/17/10)