Laserfiche WebLink
Municipality L Name <br /> CITY OF DECATURIllinois Department <br /> CWHKSof Transportation &CO. ENGINEERING <br /> Township A S Address <br /> L 7018 KINGSMILL COURT <br /> Preliminary Engineering U <br /> County A Services Agreement L city <br /> MACON E For A SPRINGFIELD <br /> N Motor Fuel Taxes N <br /> Section C T State <br /> 18-00805-00-BR Y ILLINOIS 62711 <br /> THIS AGREEMENT is made and entered into this ` day of ��,�.A 2-0 Vg between the above Local <br /> Agency(LA) and Consultant(ENGINEER)and covers certain professional engineering services in connection with the <br /> improvement of the above SECTION. Motor Fuel Tax Funds, allotted to the LA by the State of Illinois under the general <br /> supervision of the State Department of Transportation, hereinafter called the"DEPARTMENT',will be used entirely or in part <br /> to finance ENGINEERING services as described under AGREEMENT PROVISIONS. <br /> Section Description <br /> Name Taylor Road (FAU 7426) - Bridge Replacement&Main Street(FAU 7386) - Bridge Pile Repair. <br /> Route FAU 7426/7386 Length .19 Mi. ± 1000 FT (Structure No. 058-6002 ) <br /> 058-0119 <br /> Termini Taylor Road-As necessary to tie bridge approaches into existing roadway. Main Street-Bridge only. <br /> Description: <br /> Taylor Road- Removal and replacement of existing bridge structure including necessary approach roadway work. Main Street- <br /> Bridge pile repair/strengthening. <br /> Agreement Provisions <br /> The Engineer Agrees, <br /> 1. To perform or be responsible for the performance of the following engineering services for the LA, in connection with the <br /> proposed improvements herein before described, and checked below: <br /> a. ® Make such detailed surveys as are necessary for the preparation of detailed roadway plans. <br /> b. ® Make stream and flood plain hydraulic surveys and gather high water data, and flood histories for the preparation <br /> of detailed bridge plans. <br /> c. ® Make or cause to be made such soil surveys or subsurface investigations including borings and soil profiles and <br /> analyses thereof as may be required to furnish sufficient data for the design of the proposed improvement. <br /> Such investigations are to be made in accordance with the current requirements of the DEPARTMENT. <br /> d. ❑ Make or cause to be made such traffic studies and counts and special intersection studies as may be required to <br /> furnish sufficient data for the design of the proposed improvement. <br /> e. ® Prepare Army Corps of Engineers Permit, Department of Natural Resources-Office of Water Resources Permit, <br /> Bridge waterway sketch, and/or Channel Change sketch, Utility plan and locations, and Railroad Crossing work <br /> agreements. <br /> f. ® Prepare Preliminary Bridge design and Hydraulic Report, (including economic analysis of bridge or culvert types) <br /> and high water effects on roadway overflows and bridge approaches. <br /> g. ® Make complete general and detailed plans, special provisions, proposals and estimates of cost and furnish the LA <br /> with five(5) copies of the plans, special provisions, proposals and estimates. Additional copies of any or all <br /> documents, if required, shall be furnished to the LA by the ENGINEER at his actual cost for reproduction. <br /> h. ® Furnish the LA with survey and drafts in quadruplicate of all necessary right-of-way dedications, construction <br /> easement and borrow pit and channel change agreements including prints of the corresponding plats and staking <br /> as required. <br /> Note: Four copies to be submitted to the Regional Engineer <br /> Printed 5/29/2018 Page 1 of 5 BLR 05510(Rev. 11/06) <br />