My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-85 Accepting the Bid and Authorizing the Execution of a Contract with Entler Excavating Company for 2018 Miscellaneous Sanitary and Storm Sewer Improvement Project CP 2018-0
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-85 Accepting the Bid and Authorizing the Execution of a Contract with Entler Excavating Company for 2018 Miscellaneous Sanitary and Storm Sewer Improvement Project CP 2018-0
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2018 12:26:06 PM
Creation date
7/11/2018 9:26:10 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2018-85
Res Ord Title
Accepting the Bid and Authorizing the Execution of a Contract with Entler Excavating Company, Inc. for 2018 Miscellaneous Sanitary and Storm Sewer Improvement Project City Project 2018-09
Department
Public Works
Approved Date
7/2/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACT <br /> and <br /> THIS CONTRACT, made and entered into this 1,Wday of 2018, by and between <br /> the City of Decatur, Illinois, hereinafter called "Owner", and Entler Excavating Company, Inc., <br /> hereinafter called the "Contractor". <br /> WITNESSETH: <br /> That for and in consideration of the payments, covenants, and agreements stated herein, <br /> the Contractor and Owner agree as follows: <br /> 1. The Contractor shall perform and complete in a Good and Workmanlike Manner all <br /> Work required in connection with "2018 MISCELLANEOUS SANITARY & <br /> STORM SANITARY SEWER IMPROVEMENT PROJECT,CITY PROJECT <br /> 2018-09", all in strict accordance with the Contract Documents, including any and <br /> all Addenda prepared by the City Engineer, with specifications and drawings are <br /> made a part of this Contract; and in strict compliance with the Contractor's Bid <br /> Proposal and the other Contract Documents herein mentioned, which are a part of <br /> the Contract; and the Contractor shall do everything required by this Contract and <br /> the other documents constituting a part thereof. <br /> 2. Payments are to be made to the Contractor by the Owner in accordance with and <br /> subject to the provisions embodied in the documents made a part of this Contract,or <br /> as prescribed by law. <br /> 3. Work under this Contract shall commence on the date specified in the written Notice <br /> to Proceed from the Owner to the Contractor. Upon receipt of said Notice, the <br /> Contractor shall diligently and continuously prosecute and substantially complete all <br /> Work under this Contract. <br /> 4. A Completion Date is in effect for this project in accordance with Section 108 of <br /> the Illinois Department of Transportation, Standard Specifications for Road <br /> and Bridge Construction. The Completion Date for this project is June 1,2019. <br /> 5. This Contract consists of the following component parts, herein defined as the <br /> Contract Documents, all of which are as full a part of this Contract as if herein set <br /> out verbatim, or if not attached, as if hereto attached: <br /> Advertisement for Bids General Conditions <br /> Information for Bidders Special Conditions <br /> Bid Proposal Standard Specifications <br /> Addenda Number 1, dated 5/18/2018 Project Drawings <br /> Non-Collusion Affidavit Special Provisions <br /> Contract(This Instrument) Supplemental Specifications <br /> Contract Change Orders Appendix(s) <br /> Performance Bond <br /> 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.