Laserfiche WebLink
Olds DepartmentAffidavit of Availability <br /> For the Letting of 7/9/2018 <br /> Of Thl (Letting date) <br /> ' Bureau of Construction Instructions: Complete this form by either typing or using black ink. <br /> 2300 South Dirksen Parkway/Room 322 "Authorization to Bid"will not be issued unless both sides of this form are <br /> Springfield, Illinois 62764 completed in detail. Use additional forms as needed to list all work. <br /> 'Part I. Work Under Contract <br /> List below all work you have under contract as either a prime contractor or a subcontractor. It is required to include all pending low bids not yet awarded or <br /> rejected. In a joint venture,list only that portion of the work which is the responsibility of your company. The uncompleted dollar value is to be based upon the most <br /> recent engineer's or owners estimate,and must include work subcontracted to others. If no work is contracted,show NONE. <br /> 1 2 3 4 Awards Pending <br /> Contract Number n/a Cerro Gordo CUSD Austin Twp Muscatine <br /> Contract With GSI Plocher Const Austin Twp Iowa DOT <br /> Estimated Completion Date 6/18 8/19 7/18 8/18 <br /> Accumulated <br /> Total Contract Price 412,297.00 277,520.00 177,968.00 709,836.00 Totals <br /> Uncompleted Dollar Value if Firm is the <br /> Prime Contractor 412,297.00 177,968.00 709,836.00 1,562,846.00 <br /> Uncompleted Dollar Value if Firm is the <br /> Subcontractor 277,520.00 4,869,244.00 <br /> Total Value of All Work 6,432,090.00 <br /> Part II. Awards Pending and Uncompleted Work to be done with your own forces. <br /> List below the uncompleted dollar value of work for each contract and awards pending to be completed with your own forces. All work Accumulated <br /> Subcontracted to others will be listed on the reverse of this form. In a joint venture,list only that portion of the work to be done by your <br /> company. If no work is contracted,show NONE. Totals <br /> Earthwork 83,429.00 <br /> Portland Cement Concrete Paving 0.00 <br /> HMA Plant Mix 26,075.00 <br /> HMA Paving 329,120.00 207,390.00 1,930,926.00 <br /> :Clean&Seal Cracks/Joints 0.00 <br /> Aggregate Bases&Surfaces 74,149.00 67,380.00 352,635.00 <br /> Highway,R.R.and Waterway Structures 0.00 <br /> Drainage 0.00 <br /> Electrical 0.00 <br /> Cover and Seal Coats 177,968.00 2,130,442.00 <br /> Concrete Construction 0.00 <br /> Landscaping 0.00 <br /> Fencing 0.00 <br /> Guardrail 0.00 <br /> Painting 0.00 <br /> Signing 0.00 <br /> Cold Milling,Planning&Rotomilling 30,774.00 <br /> Demolition 0.00 <br /> �P_avement Markings(Paint) 2,970.00 <br /> ther Construction(List) 0.00 <br /> Stabilization 551,787.00 <br /> CIR 709,836.00 1,170,054.00 <br /> Totals 403,269.00 274,770.00 177,968.00 709,836.00 0.00 6,279,092.00 <br /> Disclosure of this information is REQUIRED to accomplish the statutory purpose as outlined in the"Illinois Procurement Code". Failure to comply will <br /> result in non-issuance of an"Authorization To Bid." This form has been approved by the State Forms Management Center. <br /> Printed 7/6/2018 Page 4 of 14 BC 57(Rev.08/17/10 <br />