Laserfiche WebLink
1 I f1C)is DeparbY1t Affidavit of Availability <br /> O -r For the Letting of 7/9/2018 <br /> (Letting date) <br /> Bureau of Construction Instructions: Complete this form by either typing or using black ink. <br /> 2300 South Dirksen Parkway/Room 322 "Authorization to Bid"will not be issued unless both sides of this form are <br /> Springfield, Illinois 62764 completed in detail. Use additional forms as needed to list all work. <br /> Feart I. Work Under Contract <br /> List below all work you have under contract as either a prime contractor or a subcontractor. It is required to include all pending low bids not yet awarded or <br /> rejected. Ina joint venture,list only that portion of the work which is the responsibility of your company The uncompleted dollar value is to be based upon the most <br /> recent engineer's or owners estimate,and must include work subcontracted to others. If no work is contracted,show NONE. <br /> 1 2 3 4 Awards Pending <br /> Contract Number [DOT Dist 2 nia Local MFT Davenport Airport <br /> Ontract With Civil Const YMCA City of Decatur Langman Const <br /> Istimated Completion Date 8/18 9/18 9/18 10/18 <br /> Accumulated <br /> Total Contract Price 146,933.00 139,115.00 2,330,463.00 403,010.00 Totals <br /> Uncompleted Dollar Value if Firm is the <br /> rime Contractor 139,115.00. 2,330,463.00 4,032,424.00 <br /> Uncompleted Dollar Value if Firm is the <br /> Subcontractor 146,933.00 403,010.00 5,419,187.00 <br /> Total Value of All Work 9,451,611.00 <br /> Part II. Awards Pending and Uncompleted Work to be done with your own forces. <br /> List below the uncompleted dollar value of work for each contract and awards pending to be completed with your own forces. All work <br /> Subcontracted to others will be listed on the reverse of this form. In a joint venture,list only that portion of the work to be done by your Accumulated <br /> company. If no work is contracted,show NONE. <br /> Totals <br /> Earthwork 23,255.00 106,684.00 <br /> ortland Cement Concrete Paving 0.00 <br /> HMA Plant Mix 26,075.00 <br /> MA Paving 46,835.00 1,000,101.00 2,977,862.00 <br /> lean&Seal Cracks/Joints 12,497.00 12,497.00 <br /> Aggregate Bases&Surfaces 36,975.00 389,610.00 <br /> ighway,R.R.and Waterway Structures 0.00 <br /> : rainage 0.00 <br /> Electrical 0.00 <br /> over and Seal Coats 2,130,442.00 <br /> Concrete Construction 0.00 <br /> Landscaping 0.00 <br /> encing 0.00 <br /> Guardrail 0.00 <br /> ainting 0.00 <br /> Signing 0.00 <br /> Cold Milling,Planning&Rotomilling 81,131.00 111,905.00 <br /> Demolition 0.00 <br /> Pavement Markings(Paint) 2,970.00 <br /> Other Construction(List) 0.00 <br /> Stabilization 252,425.00 403,010.00 1,207,222.00 <br /> CIR 146,933.00 1,316,987.00 <br /> Totals 146,933.00 107,065.00 1,346,154.00 403,010.00 0.00 8,282,254.00 <br /> Disclosure of this information is REQUIRED to accomplish the statutory purpose as outlined in the"Illinois Procurement Code". Failure to comply will <br /> ' result in non-issuance of an"Authorization To Bid." This form has been approved by the State Forms Management Center. <br /> Printed 7/6/2018 Page 5 of 14 BC 57(Rev.08/17/10 <br />