Laserfiche WebLink
EXHIBIT B Schedule 2 <br /> IV. BASELINE CALCULATIONS AND UTILITY RATES <br /> The unit utility costs for the Baseline period are set forth below as"Base Utility Cost"and shall be used for all <br /> calculations made under this Schedule. The Base Utility Cost shall be escalated annually by the actual utility cost <br /> escalation but such escalation shall be no less than the mutually agreed`floor"escalation rate of two and three- <br /> quarter percent(2.75%). The Base Utility Cost for each type of utility represents the most current 12 month <br /> average utility costs provided by the customer. <br /> Utility Type Streetlights Streetlights Parking Lots Library Civic Center <br /> (Metered) (Un-Metered) (Metered) <br /> Electric Energy $0.075/kWh $0.06381kWh $0.075*Wh $0.0661/kWh I $0.0692/kWh <br /> Utility Type Start of Escalation Annual Escalation Ratell <br /> Electric Energy Year-2 2.750% <br /> Performance Contract(Rev 15) <br /> Johnson Controls,Inc.—Proprietary <br /> ©2008 Johnson Controls,Inc. <br /> 17 <br />