Laserfiche WebLink
EXHIBIT B Schedule 2 <br /> VI. MEASUREMENT & VERIFICATION SERVICES <br /> JCI will provide the M&V Services set forth below in connection with the Assured Performance Guarantee. <br /> 1. During the Installation Period, a JCI Energy Solutions Performance Engineer will track Measured Project <br /> Benefits. JCI will report the Measured Project Benefits achieved during the Installation Period to Customer <br /> within 60 days of the commencement of the Guarantee Term. <br /> 2. Within 60 days of each anniversary of the commencement of the Guarantee Term, JCI will provide <br /> Customer with an annual report containing: <br /> A. an executive overview of the project's performance and Project Benefits achieved to date; <br /> B. a summary analysis of the Measured Project Benefits accounting; and <br /> C. depending on the M&V Option, a detailed analysis of the Measured Project Benefits calculations. <br /> 3. During the Guarantee Term, a JCI Energy Solutions Performance Engineer will monitor the on-going <br /> performance of the Improvement Measures, as specified in this Agreement, to determine whether <br /> anticipated Measured Project Benefits are being achieved. In this regard, on a semi-annual basis the <br /> Energy Solutions Performance Engineer will assist Customer with respect to the following activities: <br /> A. remotely connect to the facility management system to confirm that control strategies are in place <br /> and functioning; <br /> B. advise Customer's designated personnel of any performance deficiencies based on such <br /> information; <br /> C. coordinate with Customer's designated personnel to address any performance deficiencies that <br /> affect the realization of Measured Project Benefits; and <br /> D. inform Customer of opportunities to further enhance project performance and of opportunities for <br /> the implementation of additional Improvement Measures. <br /> 4. For specified Improvement Measures utilizing an"Option A" M&V protocol, JCI will: <br /> A. conduct pre and post installation measurements required under this Agreement; <br /> B. confirm the building management system employs the control strategies and set points specified in <br /> this Agreement; and <br /> C. analyze actual as-built information and adjust the Baseline and/or Measured Project Benefits to <br /> conform to actual installation conditions (e.g., final lighting and water benefits calculations will be <br /> determined from the as-built information to reflect the actual mix of retrofits encountered during <br /> installation). <br /> Performance Contract(Rev 15) <br /> Johnson Controls,Inc.—Proprietary <br /> ©2008 Johnson Controls,Inc. <br /> 20 <br />