My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-109 Accepting the Bid and Authorizing the Execution of a Contract with D&O Construction for Fire Station Renovation Project
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-109 Accepting the Bid and Authorizing the Execution of a Contract with D&O Construction for Fire Station Renovation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 11:22:28 AM
Creation date
9/4/2018 9:22:57 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2018-109
Res Ord Title
Resolution Accepting the Bid and Authorizing the Execution of a Contract with D&O Construction for Fire Station Renovation Project
Department
Fire
Approved Date
8/20/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additions and Deletions Report for <br /> AIA®Document A 101 TM—2007 <br /> This Additions and Deletions Report,as defined on page 1 of the associated document,reproduces below all text the author has <br /> added to the standard form AIA document in order to complete it,as well as any text the author may have added to or deleted from <br /> the original AIA text.Added text is shown underlined.Deleted text is indicated with a horizontal line through the original AIA text. <br /> Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or constitute any <br /> part of the associated AIA document.This Additions and Deletions Report and its associated document were generated <br /> simultaneously by AIA software at 11:09:21 on 08/21/2018. <br /> PAGE 1 <br /> AGREEMENT made as of the 22nd day of August in the year 2018 <br /> City of Decatur <br /> 1 Gary K Anderson Plaza. <br /> Decatur,Illinois 62523 <br /> Telephone Number:217-424 2702 <br /> D&O Contractos Inc.. <br /> 3849 N Skippy Dr. <br /> Decatur,IL,62526 <br /> Telephone Number:217-875-1016 <br /> Decatur Fire Department Renovation Work Phase II <br /> Proiect consists of the Renovation work to Fire Stations#1 #2 #4  per the`Bid Documents"drawings and <br /> specifications dated 5/28/18 and Addendum 1 issued 06/26/18. <br /> Dewberry Architects,Inc <br /> 401 SW Water Street. <br /> Suite 700 <br /> Peoria,Illinois 61602 <br /> Telephone Number:309.282.8000 <br /> PAGE 3 <br /> All Work December 18,2018 <br /> Additions and Deletions Report for AIA Document A101 TM—2007.Copyright©1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987, <br /> 1991,1997 and 2007 by The American Institute of Architects.All rights reserved.WARNING:This AIA®Document is protected by U.S.Copyright Law and <br /> International Treaties.Unauthorized reproduction or distribution of this AIA® Document,or any portion of it,may result in severe civil and criminal <br /> penalties,and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 11:09:21 on 08/21/2018 <br /> under Order No.8065734178 which expires on 04/11/2019,and is not for resale. <br /> User Notes: (3B9ADA20) <br />
The URL can be used to link to this page
Your browser does not support the video tag.