My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-109 Accepting the Bid and Authorizing the Execution of a Contract with D&O Construction for Fire Station Renovation Project
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-109 Accepting the Bid and Authorizing the Execution of a Contract with D&O Construction for Fire Station Renovation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 11:22:28 AM
Creation date
9/4/2018 9:22:57 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2018-109
Res Ord Title
Resolution Accepting the Bid and Authorizing the Execution of a Contract with D&O Construction for Fire Station Renovation Project
Department
Fire
Approved Date
8/20/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DECATUR FIRE DEPARTMENT Bid Documents <br /> FIRE STATION 1,2,4,AND 6 PHASE 2 RENOVATIONS January 31,2018 <br /> DECATUR,ILLINOIS Dewberry Architects Inc. 50083270 <br /> SECTION 007300-SUPPLEMENTARY CONDITIONS <br /> A. ARTICLE I —GENERAL PROVISIONS: <br /> (1) Pursuant to Subparagraph 1.1.1,enumeration of Drawings, Specifications and Addenda is <br /> as follows: <br /> A. ADDENDA: Contract will include such Addenda as may be issued during the <br /> bidding period and acknowledged in the Proposal Forms. <br /> B. PROJECT MANUAL dated, January 2, 2018. Refer to "Table of Contents — <br /> Bidding Requirements and Contract Documents"bound hereinbefore. <br /> C. DRAWINGS: See Document 000115. <br /> B. ARTICLE 2—OWNER: <br /> (1) Subparagraph 2.1.2 is deleted in its entirety. <br /> (2) Subparagraph 2.2.1 is deleted in its entirety. <br /> (3) Subparagraph 2.3.1 is amended by deleting the comma and the words "except to the <br /> extent required by Subparagraph 6.1.3"from line 5. <br /> C. ARTICLE 3—CONTRACTOR: <br /> (1) Paragraph 3.4 LABOR AND MATERIALS: <br /> Add the following Subparagraphs 3.4.4., 3.4.5.,and 3.4.6 to 3.4: <br /> 3.4.4. After the Contract has been executed,the Owner and the Architect will consider a <br /> formal request for the substitution of products in place of those specified only under the <br /> conditions set forth below and in the General Requirements (Division I of the <br /> Specifications). <br /> 1 Required for compliance with subsequent interpretation of code requirements or <br /> insurance regulations. <br /> .2 Unavailability of specified products,through no fault of the Contractor. <br /> .3 Subsequent information discloses inability of specified products to perform <br /> properly or to fit in designated space. <br /> .4 Manufacturer/fabricator refuses to certify or guarantee performance of specified <br /> product as required. <br /> .5 When it is clearly seen, in the judgment of the Architect, that a substitution <br /> would be substantially to the Owner's best interest, in terms of cost,time or other <br /> consideration. <br /> SUPPLEMENTARY CONDITIONS 007300-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.