My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-109 Accepting the Bid and Authorizing the Execution of a Contract with D&O Construction for Fire Station Renovation Project
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-109 Accepting the Bid and Authorizing the Execution of a Contract with D&O Construction for Fire Station Renovation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 11:22:28 AM
Creation date
9/4/2018 9:22:57 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2018-109
Res Ord Title
Resolution Accepting the Bid and Authorizing the Execution of a Contract with D&O Construction for Fire Station Renovation Project
Department
Fire
Approved Date
8/20/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DECATUR FIRE DEPARTMENT Bid Documents <br /> FIRE STATION 1,2,4,AND 6 PHASE 2 RENOVATIONS January 31,2018 <br /> DECATUR,ILLINOIS Dewberry Architects Inc. 50083270 <br /> (4) Add the following subparagraph 3.7.1.1: <br /> 1 Certificates of inspection and occupancy shall be delivered to Architect promptly <br /> upon receipt. <br /> (5) Paragraph 3.12 Shop Drawings, Product Data and Samples; add the following <br /> Subparagraphs 3.12.11 through 3.12.12: <br /> 3.12.11 The Contractor shall prepay all shipping costs and otherwise be responsible for <br /> the transporting of all shop drawings and samples to the place for review by the <br /> Architect. <br /> 3.12.12 Before submitting Subcontractor's shop drawings to the Architect, the <br /> Contractor shall carefully check such shop drawings and supply field dimensions and any <br /> other information requested by the subcontractor. Any marks made by the Contractor or <br /> Subcontractor shall be initialed by the party providing said information. The Contractor <br /> shall check his Subcontractor's shop drawings for compliance with the Drawings, <br /> Specifications, Addenda, Change Orders, and Architect's Supplemental Instructions for <br /> coordination with other work and field conditions. <br /> (6) Paragraph 3.18 INDEMNIFICATION. <br /> Delete Subparagraphs in their entirety and replace with the following Subparagraphs <br /> 3.18.1 through Paragraph 3.18.5: <br /> 3.18.1 To the fullest extent permitted by law,the Contractor shall waive any right of <br /> contribution and shall indemnify and hold harmless the Owner, the Architect and their <br /> agents and employees and consultants from and against all claims, damages, losses and <br /> expenses, including but not limited to attorneys' fees and economic or consequential <br /> damages, arising out of or resulting from or in connection with the performance of the <br /> Work, provided that such claim, damage, loss or expense is caused in whole or in part by <br /> any negligent act or omission of any Contractor, any Subcontractor, anyone directly or <br /> indirectly employed by any of them or anyone for whose acts any of them may be liable, <br /> regardless of whether or not it is caused in part by a party indemnified hereunder. Such <br /> obligation shall not be construed to negate, abridge, or otherwise reduce any other right <br /> or obligation of indemnity which would otherwise exist as to any party or person <br /> described in this Agreement. <br /> 3.18.1.1 The foregoing Subparagraph shall, but not by way of limitation, specifically <br /> include all claims and judgments which may be made against the Owner, Architect, <br /> Architect's consultants, and agents and employees of any of them under the applicable <br /> state laws, or similar laws of other governmental bodies having jurisdiction; and further, <br /> against claims and judgments arising from violations of public ordinances and <br /> requirements of governing authorities due to the Contractor's or Subcontractor's method <br /> of execution of the work. <br /> 3.18.2 In any and all claims against the Owner or Architect or any of their agents or <br /> employees and consultants by any employee of the Contractor or any Subcontractor, <br /> anyone directly or indirectly employed by any of them or anyone for whose acts any of <br /> them may be liable, the indemnification obligation under this Paragraph agreement shall <br /> SUPPLEMENTARY CONDITIONS 007300-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.