My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-109 Accepting the Bid and Authorizing the Execution of a Contract with D&O Construction for Fire Station Renovation Project
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-109 Accepting the Bid and Authorizing the Execution of a Contract with D&O Construction for Fire Station Renovation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 11:22:28 AM
Creation date
9/4/2018 9:22:57 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2018-109
Res Ord Title
Resolution Accepting the Bid and Authorizing the Execution of a Contract with D&O Construction for Fire Station Renovation Project
Department
Fire
Approved Date
8/20/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DECATUR FIRE DEPARTMENT Bid Documents <br /> FIRE STATION 1,2,4,AND 6 PHASE 2 RENOVATIONS January 31,2018 <br /> DECATUR,ILLINOIS Dewberry Architects Inc. 50083270 <br /> remain in force after final payment and are reasonably available, an additional certificate <br /> evidencing continuation of such coverage shall be submitted with the final Application <br /> for Payment as required by Subparagraph 9.10.2. Information concerning reduction of <br /> coverage shall be furnished by the Contractor with reasonable promptness in accordance <br /> with the Contractor's information and belief. <br /> The obligations of the Contractor under the provisions of this article shall not extend to <br /> the liability of the Architect, his agents or employees arising out of(1)the preparation or <br /> approval of maps, drawings, opinions, reports surveys, change orders designs, or <br /> specifications, or (2) the giving of or the failure to give directions or instructions by the <br /> Architect, his agent or employees to the extent that such giving or failure to give is the <br /> cause of the injury or damage. <br /> 11.1.3.3 These Certificates and the insurance policies required by this Paragraph 11.1 <br /> shall contain a provision that names the Architect and their consultants as additional <br /> insureds on a primary and non-contributory basis. <br /> 11.2 OWNER'S LIABILITY INSURANCE <br /> 11.2.1 The Owner shall be responsible for purchasing and maintaining the Owner's <br /> usual liability insurance. Optionally, the Owner may purchase and maintain other <br /> insurance for self-protection against claims which may arise from operations under the <br /> Contract. The Contractor shall not be responsible for purchasing and maintaining this <br /> optional Owner's Liability Insurance unless specifically required by the Contract <br /> Documents. <br /> 11.4 PERFORMANCE BOND AND PAYMENT BOND <br /> 11.4.1 The Owner shall require the Contractor to furnish bonds covering faithful <br /> performance of the contractor and payment of obligations arising thereunder as stipulated <br /> in bidding requirements or specifically required in the Contract Documents on the date of <br /> execution of the Contract. <br /> 11.4.2 Upon the request of any person or entity appearing to be a potential <br /> beneficiary of bonds covering payment of obligations arising under the Contract, the <br /> Contractor shall promptly furnish a copy of the bonds or shall permit a copy to be made. <br /> 11.4.3 The Contractor, before commencing the Work, shall furnish a Performance <br /> Bond and a Labor and Material Payment Bond. The Performance Bond shall be in an <br /> amount equal to 100 percent of the full amount of the Contract Sum as security for the <br /> faithful performance of the obligations of the Contract Documents and the Labor and <br /> Material Payment Bond shall be in an amount equal to 100 percent of the full amount of <br /> the Contract Sum as Security for the payment of all persons performing labor and <br /> furnishing materials in connection with the Contract Documents. Such bond shall be on <br /> AIA Document A-312, issued by the American Institute of Architects, shall be issued by <br /> a surety satisfactory to the Owner and shall name the Owner as a primary co-obligee. <br /> SUPPLEMENTARY CONDITIONS 007300-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.