Laserfiche WebLink
DECATUR FIRE DEPARTMENT Bid Set <br /> FIRE STATION 5 July 10, 2018 <br /> DECATUR, ILLINOIS Dewberry Architects Inc. 50101919 <br /> 3.4.5. By making requests for substitutions based on Subparagraph 3.4.4 above, the <br /> Contractor: <br /> .l Represents that the Contractor has personally investigated the proposed substitute <br /> product and determined that it is equal or superior in all respects to that specified; <br /> .2 Represents that the Contractor will provide the same warranty for the substitution <br /> that the Contractor would for that specified; <br /> .3 Certifies that the cost data presented is complete and includes all related costs <br /> under this Contract except the Architect's redesign costs, and waives all claims <br /> for additional costs related to the substitution which subsequently become <br /> apparent; and <br /> .4 Will coordinate the installation of the accepted substitute, making such changes <br /> as may be required for the Work to be complete in all respects. <br /> .5 Will promptly reimburse the Architect/Engineer at A/E's standard hourly rates <br /> for review of substitution request, whether or not request is accepted. <br /> 3.4.6 Substitution requests shall be written, timely, and accompanied by adequate <br /> technical and cost data. Requests shall include a complete description of the proposed <br /> substitution, name of the material or equipment for which it is to be substituted, <br /> drawings, cuts, performance and test data, and any other data or information necessary <br /> for a complete evaluation by the Architect. <br /> (2) Paragraph 3.6 TAXES. Add the followin Sub ara raph: <br /> an Illinois municipality <br /> 3.6.2 The Owner being � ^^*-f�r_^r^f;* �r ���*;�� it is believed that none of <br /> following taxes accrue from the performance of this Contract: Retailer's Occupation <br /> Tax, Service Occupation Tax, Use Tax, or Service Use Tax (either state, municipal or <br /> county) and Federal Retail Excise Tax. Costs for these taxes shall be excluded from the <br /> proposal at the time of bidding and from the Contract sum; provided, however, should it <br /> be determined that any of said taxes do accrue from the performance of this Contract then <br /> said taxes so accruing shall be adjusted according to the liability therefore as determined, <br /> and in accordance with Article 7. <br /> (3) Paragraph 3.7 PERMITS,FEES and NOTICES;replace Subparagraph 3.7.1 as follows: <br /> The Generai Contractor shall include in his Bid the amount necessary for the overhead <br /> and labor costs necessary to obtain the building permit for the project. In addition, The <br /> General Contractor shall obtain other permits, as required, for all work, both permanent <br /> and temporary, installed by him or his subcontractors and shall obtain and deliver to the <br /> Owner a final certificate of inspection prior to the acceptance of the work by the <br /> Architect. The Owner shall reimburse the General Contractor for the actual amounts paid <br /> for building permit and utility connection fees. Inspection fees shall be the responsibility <br /> of the contractor and shall be included in the bid. <br /> SUPPLEMENTARY CONDITIONS 007300- 2 <br />