Laserfiche WebLink
Chapter 69 <br /> correct or abate a violation, or to stop an illegal act, conduct, business or operation of electrical <br /> equipment or systems in or about any premises. <br /> 15. RE-INSPECTION FEES. A re-inspection fee of$30.00 shall be assessed against <br /> the applicant for a construction permit who has requested an inspection which cannot be <br /> completed and/or approved by the Inspection Division for any of the following reasons: <br /> (1) the work for which the inspection has been requested is not installed or <br /> completed to the extent that an inspection can be made, <br /> (2) the inspection reveals that the electrical system has more than three code <br /> violations due to: equipment not installed per instructions included in the listing or labeling; <br /> equipment installed without correct polarity; components not properly grounded; wiring not <br /> installed as to be free from short circuits; equipment installed with improper ratings; devices and <br /> fixtures not energized because of loose connections or broken wires, <br /> (3) the Inspector is unable to gain entry at the time requested by the contractor, <br /> (4) when previously noted violations have not been corrected. <br /> Fees assessed as herein provided may be appealed to the Construction and Housing <br /> Board of Appeals by filing a notice of such appeal with the City Clerk within fourteen (14) days <br /> of the mailing of notice of such assessment. An appeal shall stay the due date for payment until <br /> the date of the final order of the Board. <br /> Such fees shall be assessed by mailing notice of same to the owner or other person by <br /> certified mail, return receipt requested. Payment thereof shall be due fourteen (14) days after <br /> mailing of such notice, which notice must contain a statement of the right of the owner or other <br /> person to appeal the same to the Board and the time limitation thereon. <br />