My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-67 Ordinance Amending City Code Chapter 69 Electrical Code
COD
>
City Clerk
>
ORDINANCES
>
2018
>
2018-67 Ordinance Amending City Code Chapter 69 Electrical Code
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2018 1:47:48 PM
Creation date
11/6/2018 1:47:46 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2018-67
Res Ord Title
2018-67 Ordinance Amending City Code Chapter 69 Electrical Code
Department
Econ and Com Dev
Approved Date
11/5/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 69 <br /> H. Wiring for replacement signs from existing switch or disconnect where circuit wires <br /> are of adequate size. <br /> I. Service related work such as replacing fuses, circuit breakers, motors, or controls in <br /> existing buildings or appliances. This would include heating elements of ranges, furnaces, water <br /> heaters, etc. <br /> J. Replacing broken meter sockets or masts on services where no new conduit or <br /> conductors are changed, enlarged, or replaced. <br /> K. Permits are valid for a period of six (6) months for new construction and ninety (90) <br /> days for renovation; or with an approved extension. <br /> (Amended, Ordinance No. 2008-09, March 17, 2008) <br /> (Amended, Ordinance No. 2002-16, April 1, 2002) <br /> (Amended, Ordinance No. 99-33, Apri15, 1999) <br /> 7. WORK DONE WITHOUT PERMIT. Except for work performed in response to an <br /> unanticipated emergency at a time other than the regular business hours of the building official <br /> and for which a permit is later obtained during the next succeeding regular business day of said <br /> official, should any work for which a permit is required be commenced or done before such <br /> permit is issued and obtained the required permit may nonetheless be issued for such and <br /> subsequent work; however, the amount of the required fee as provided herein for all work, both <br /> that commenced before and that proposed to be done after said permit is issued, shall be double <br /> that otherwise so provided, and issuance of such permit shall not, and shall not be construed to <br /> be, an excuse from, or waiver of, or defense to or absolution from any liability or action <br /> otherwise provided for in said Code or this Chapter but shall be cumulative of and in addition <br /> thereto. <br />
The URL can be used to link to this page
Your browser does not support the video tag.