Laserfiche WebLink
LOCaI PubliC AgenCy State Contract Day Labor Local Contract RR Force Account <br /> , �j Illinois Departmer�t <br /> `d of Trans�rtation City of Decatur X <br /> Local Public Agency Agreement Section Fund Type ITEP,SRTS,or HSIP Number(s) <br /> for Federal Participation 17-00706-00-BR STU <br /> Construction En ineerin Ri ht-of-Wa <br /> Job Number Project Number Job Number Project Number Job Number Project Number <br /> C-97-059-18 EBDH(794) <br /> This Agreement is made and entered into between the above local public agency, hereinafter referred to as the"LPA", and the State of <br /> Illinois, acting by and through its Department of Transportation, hereinafter referred to as"STATE". The STATE and LPA jointly <br /> propose to improve the designated location as described below. The improvement shall be constructed in accordance with plans <br /> prepared by, or on behalf of the LPA, approved by the STATE and the STATE's policies and procedures approved and/or required by <br /> the Federal Highway Administration, hereinafter referred to as"FHWA". <br /> Location <br /> Local Name Mound Road Route FAU 7359 Length 0.02 mi. <br /> Termini North Side Decatur AT Spring Creek and East Mound Road AT Spring Creek <br /> 058-3035 <br /> Current Jurisdiction City of Decatur TIP Number DEC19-03 Existing Structure No 058-3036 <br /> Project Description <br /> Two bridge superstructure replacements,substructure repair,and other items necessary to complete the section. <br /> Division of Cost <br /> Type of Work STU "/o % �PA % Total <br /> Participating Construction 1,900,000 ( " ) ( ) 475,000 ( BAL ) 2,375,000 <br /> Non-Participating Construction ( ) ( ) ( ) <br /> Preliminary Engineering ( ) ( ) ( ) <br /> Construction Engineering ( ) ( ) ( ) <br /> Right of Way ( ) ( ) ( ) <br /> Railroads ( ) ( ) ( ) <br /> Utilities ( ) ( ) ( ) <br /> Materials <br /> TOTAL $ 1,900,000 $ $ 475,000 $ 2,375,000 <br /> *80% STU Funds NTE$1,900,000 <br /> NOTE: The costs shown in the Division of Cost table are approximate and subject to change. The final LPA share is dependent on the final Federal <br /> and State participation. The actual costs will be used in the final division of cost for billing and reimbursment. <br /> If funding is not a percentage of the total,place an asterisk in the space provided for the percentage and explain above. <br /> Local Public Agency Appropriation <br /> By execution of this Agreement,the LPA attests that sufficient moneys have been appropriated or reserved by resolution or ordinance <br /> to fund the LPA share of project costs. A copy of the authorizing resolution or ordinance is attached as an addendum(required for <br /> State-let contracts only) <br /> Method of Financing (State Contract Work Only) <br /> METHOD A---Lump Sum(80%of LPA Obligation) <br /> METHOD B--- Monthly Pavments of due by the of each successive month. <br /> METHOD C---LPA's Share BALANCE divided bv estimated total cost multiplied by actual proclress payment. <br /> (See page two for details of the above methods and the financing of Day Labor and Local Contracts) <br /> Printed 11/30/2018 Page 1 of 5 BLR 05310(Rev.01/29/18) '� <br />