My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-146 Resolution Authorizing Local Public Agency Agreement for Federal Participation with the State of Illinois to Improve the Mound Road West and Middle Bridges over Spring Creek
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-146 Resolution Authorizing Local Public Agency Agreement for Federal Participation with the State of Illinois to Improve the Mound Road West and Middle Bridges over Spring Creek
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 11:12:42 AM
Creation date
12/5/2018 4:28:27 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2018-146
Res Ord Title
R2018-146 Resolution Authorizing Local Public Agency Agreement for Federal Participation with the State of Illinois to Improve the Mound Road West and Middle Bridges over Spring Creek
Department
Public Works
Approved Date
12/3/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Public Agency State Contract Day Labor Locai Cantract RR Force Account <br /> <�j�1 �t10�S�G�}af"�1"17d'it <br /> ;� o�E TiatlSpflti;atit)t1 Gity of Decatur X <br /> Local Public Agency Agreement Section Fund"fype ITEP,SRTS,or HSIP Number(sj <br /> for Federal Participation 17-00706-00-BR STU <br /> Canstruction En ineerin Ri ht-of-Wa <br /> Job Number Project Number Job Number Project Number Job Number Project Number <br /> C-97-059-18 EBDH(794} <br /> This Agreement is made and entered into between the above local public agency,hereinafter referred to as the"LPA",and the State of <br /> Illinois,acting by and through its Departm�nt of Transportation, hereinafter referred ta as"STA7E". The STATE and LPA jointly <br /> propose to improve the designated location as described below. The improvement shall be eanstruc#ed in aecordanee with plans <br /> prepared by,ar on behalf of the LPA,appraved by the STATE and the STATE's palicies and procedures approved and/or required by <br /> #he Federa{Highway Administratian,hereinafte�re#erred to as"�HWA". <br /> Location <br /> Local Name Mound Road Route FAU 7359 L.ength 0.02 mi. <br /> Termini Narth Side Decatur AT S.pring Creek and East Mound Road AT Spring Creek <br /> oss-soss <br /> Current Jurisdiction City of Decatur TIP Number DEC19-03 Existing Structure No q5&3036 <br /> Projeat Description <br /> Two bridge superstcucture replacemenfs,substructure repair,and o#her items necessary to complete the sectian. <br /> Division of Cost <br /> Type of Work STU % °/u �-�'A % Tatal <br /> Participating Construction 1,940,000 { * } { } 475,000 { BAL } 2,375,000 <br /> Non-Participating Construction ( ) ( ) ( ) <br /> Pretiminary Engineering ( } ( ) { ) <br /> Construc#ion Engineering ( } t ) ( ? <br /> Right of Way ( ) ( j ( ) <br /> Railroads { } ( } { } <br /> Utilities ( ) ( ) ( ) <br /> Materials <br /> TOTAL $ 1,900,000 $ $ 475,004 $ 2,375,p00 <br /> *80°lo STU Fu�3dS NTE$1,9(}0,000 <br /> ��jE� The casts shawn in the Division of Cost table are approximate and subject ta change. The final LPA share is dependent an the final Federal <br /> and State participation. The actual costs wiU be used in the final division af cost for bilting and reimbursment. <br /> If funding is not a percentage of the total,place an asterisk in the space pravided for the percentage and explain above. <br /> Lacal Pubtic Agency Apprapriatioa <br /> By execution of this Agreement,the LPA attests#hat sufficient moneys have been appropriated or reserved by resolution or ordinance <br /> to fund the LPA shace a#project casts. A copy of the authorizing resofufson ar ordinance is attached as an addendum{required#a� <br /> State-tet contracts onty} <br /> Method of Financing(State Cantract WarEc ONy} <br /> METH�D A--Lump Sum(80%of LPA Obligation) <br /> METNCrp B--- MonthlY PavmenEs af due by the of each successive month. <br /> METHOD C---LPA's Share BALANCE divided bV�:stimated total cost multiplied by actual praqress payment. <br /> (5ee page two for de#ails of the above methods and the financing ofi Day Labor and Laca(Contracts) <br /> Printed 11/26/2018 Pa�e 1 of 5 BLR 05310(Rev.01/29/18) <br /> Exhilait A <br />
The URL can be used to link to this page
Your browser does not support the video tag.