Laserfiche WebLink
Local Public Agency State Contract Day Labor Locai Cantract RR Force Account <br /> <�j�1 �t10�S�G�}af"�1"17d'it <br /> ;� o�E TiatlSpflti;atit)t1 Gity of Decatur X <br /> Local Public Agency Agreement Section Fund"fype ITEP,SRTS,or HSIP Number(sj <br /> for Federal Participation 17-00706-00-BR STU <br /> Canstruction En ineerin Ri ht-of-Wa <br /> Job Number Project Number Job Number Project Number Job Number Project Number <br /> C-97-059-18 EBDH(794} <br /> This Agreement is made and entered into between the above local public agency,hereinafter referred to as the"LPA",and the State of <br /> Illinois,acting by and through its Departm�nt of Transportation, hereinafter referred ta as"STA7E". The STATE and LPA jointly <br /> propose to improve the designated location as described below. The improvement shall be eanstruc#ed in aecordanee with plans <br /> prepared by,ar on behalf of the LPA,appraved by the STATE and the STATE's palicies and procedures approved and/or required by <br /> #he Federa{Highway Administratian,hereinafte�re#erred to as"�HWA". <br /> Location <br /> Local Name Mound Road Route FAU 7359 L.ength 0.02 mi. <br /> Termini Narth Side Decatur AT S.pring Creek and East Mound Road AT Spring Creek <br /> oss-soss <br /> Current Jurisdiction City of Decatur TIP Number DEC19-03 Existing Structure No q5&3036 <br /> Projeat Description <br /> Two bridge superstcucture replacemenfs,substructure repair,and o#her items necessary to complete the sectian. <br /> Division of Cost <br /> Type of Work STU % °/u �-�'A % Tatal <br /> Participating Construction 1,940,000 { * } { } 475,000 { BAL } 2,375,000 <br /> Non-Participating Construction ( ) ( ) ( ) <br /> Pretiminary Engineering ( } ( ) { ) <br /> Construc#ion Engineering ( } t ) ( ? <br /> Right of Way ( ) ( j ( ) <br /> Railroads { } ( } { } <br /> Utilities ( ) ( ) ( ) <br /> Materials <br /> TOTAL $ 1,900,000 $ $ 475,004 $ 2,375,p00 <br /> *80°lo STU Fu�3dS NTE$1,9(}0,000 <br /> ��jE� The casts shawn in the Division of Cost table are approximate and subject ta change. The final LPA share is dependent an the final Federal <br /> and State participation. The actual costs wiU be used in the final division af cost for bilting and reimbursment. <br /> If funding is not a percentage of the total,place an asterisk in the space pravided for the percentage and explain above. <br /> Lacal Pubtic Agency Apprapriatioa <br /> By execution of this Agreement,the LPA attests#hat sufficient moneys have been appropriated or reserved by resolution or ordinance <br /> to fund the LPA shace a#project casts. A copy of the authorizing resofufson ar ordinance is attached as an addendum{required#a� <br /> State-tet contracts onty} <br /> Method of Financing(State Cantract WarEc ONy} <br /> METH�D A--Lump Sum(80%of LPA Obligation) <br /> METNCrp B--- MonthlY PavmenEs af due by the of each successive month. <br /> METHOD C---LPA's Share BALANCE divided bV�:stimated total cost multiplied by actual praqress payment. <br /> (5ee page two for de#ails of the above methods and the financing ofi Day Labor and Laca(Contracts) <br /> Printed 11/26/2018 Pa�e 1 of 5 BLR 05310(Rev.01/29/18) <br /> Exhilait A <br />