Laserfiche WebLink
��� INinois Department <br /> O� T1��0�1 AVERAGE HOURLY PROJECT RATES <br /> ROUTE Brush College Road(FAU 7448) <br /> SECTION City of Decatur Consultant CRAWFORD, MURPHY AND TILLY,INC. <br /> COUNTY 17-00933-00-LA <br /> JOB NO. R-97-007-17 DATE 10/04/18 <br /> PTB N/A SHEET 1 OF 2 <br /> PROJECT DATA COLLECTION& LAND SURVEYS 8 RIGHT pARCEL REVIEW <br /> AVG TOTAL PROJECT RATE REVIEW OF WAY DOCIJMENTS PARCEL APPRAISALS APPRAISALS NEGOTIATIONS <br /> PAYROLL HOURLY Hours °eb Wgtd Hou►5 % Wgtd Hours % Wgtd Hours % Wgtd Hou�S °h Wgtd HouB "!a Wgtd <br /> CLASSIFICATION RATES PaR. Avg Part. Avg Part. Avg part. Avg Part Avg Part. Avg <br /> PRINCIPAL 70.00 6 0.39'% 0.27 <br /> SENIOR PROJECT ENGINEER 64.16 62 4.03°h 2.59 8 e.00% 5.13 4 an% 2.s� 2 3.85% z.a� 4 �.sz^� o.s� 4 o.s�% 0.39 <br /> PROJECT ENGINEER/MANAGER 51.02 108 7.o2^ia 3.58 12 �2.00% s.�2 12 �2.50% s.as 4 �.ss^� s.s2 8 3.03°6, 1.55 8 �.z2^,6 o.e2 <br /> SENIOR ENGINEER 39.17 390 25.36% s.ss 16 ts.00^,� s.27 16 �s.s7^� 6,53 6 11.54% 4.52 24 s.os� 3.56 240 36.59% 74.33 <br /> SENIOR TECHNICAL MANRGER 44.18 588 38.23% �s.as 40 ao.00^io �7.67 40 a�.s7�� ta.a� 40 �s.sz% 33.99 220 83.33% 36.82 140 z1.34% 9.43 <br /> ENGINEER 31.06 0 <br /> SENIOR PLANNER 39.U8 336 z�.a5% s.5a 20 20.00% 7.a2 20 zo.ea% 8.�a 240 36.59% t4.so <br /> REGISTERED LAND SURVEYOR 43.75 0 <br /> SENIOR TECHNICIAN 37.02 0 <br /> TECHNICIAN U 28.54 0 <br /> TECHNICAL I 23.95 0 <br /> CLERICAUWORD PROCESSOR 22.33 48 s.t2% o.�0 4 a.00^� 0.89 4 a.��^� 0,93 $ 3.03°/a 0.68 24 3.68% o.az <br /> t�1 <br /> � <br /> � <br /> N• <br /> a• <br /> w <br /> rt <br /> � <br /> TOTALS 1538 100% $42.50 100 100% $43.90 96 100°� $43.06 52 10p% $44.90 264 100°k $43.58 656 100°h $39.89 <br /> Printed 10/4/2018 Page 4 BDE 025(Rev.11/06) <br />