My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2019-28 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing & Heating Co., Inc. for 2019 Annual Water Main Replacement Project, Fairlawn Neighborhood, City Project 2019-10
COD
>
City Clerk
>
RESOLUTIONS
>
2019
>
R2019-28 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing & Heating Co., Inc. for 2019 Annual Water Main Replacement Project, Fairlawn Neighborhood, City Project 2019-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 11:12:41 AM
Creation date
3/6/2019 9:06:04 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
Resolution
Res Ord Title
R2019-28 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing & Heating Co., Inc. for 2019 Annual Water Main Replacement Project, Fairlawn Neighborhood, City Project 2019-10
Department
Public Works
Approved Date
3/4/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addenda 1-Bid Proposal Forms <br /> W�RK. PAY . <br /> 1. � PE&CRIPTION lJNFf .Q?i"Y U�t1T �ICE EyCI'EN$ION <br /> 43 6CAS5 D PP,TCHES,5 INCN P�VEMENT SQ YD 1,2BD 106.00 133,560.00 <br /> 44 CCfiSS B PATCHES,8{NCH PAVEiJfENT SQ YD i,750 135.00 236,25�.�� <br /> 45 GLr4SS D PATCMES,3 lNCN DRlV�V1►AYS SQ Yp 300 92�00 27,C0�.00 <br /> 46 AGGREGATE dRPVEWAY f�EPLAGEM�NI",8 TON 800 40.00 32,000.00 <br /> lNCH — <br /> 47 TEMPORARY EROSION_CON'fR0l,SEEDING LB �pp 20.00 2,000.00 <br /> 4.8 7�MPpRARY ERQSIQN COhlTROL, FEET 1D0 5.00 500.00 <br /> PERtMETER BARF2IER <br /> 49 GRADINf3&SHAPING DITCHES FEEf' �70 65.00 43,550.OQ <br /> 50 SEEOING,CLASS 1 {CAWt�MIXTURE}{160 LB 7fl 93.00 6,510.00 <br /> LB/ACRE) <br /> 61 PHQSPHORUS FERTILI��R t�UTR1ENT(90 LB 74 6.00 444.00 <br /> LB/ACM�E) <br /> �2 POTASSIUM FERTiLi2ER�lUTF21ENT �g y,q 6.00 444.00 <br /> 53 NITROGEN FERTILIZER NUTRIENT(g0 LB 74 s.00 444.00 <br /> LB/ACF2E) <br /> 54 MULCH, METI-tbQ 2(2 TtJtJ8lACFtE) 1'(�N 2 2,300.00 4,600.00 <br /> 55 E�PlOF�1TIflN EXCAI�ATIONS EACH 36 750•0° 27,000.00 <br /> �6 121NCH CASiNGS ��E-� �� 61.00 10,980.00 <br /> 57 16 iNGH CASVNGS F�ET ipa 1 15.�� 11,500.00 <br /> b8 t�i�u�STOP,�-IN ��H � 6,500.00 6,500.Q0 <br /> 89 TRAFFIC CqNTROL LSUM � 130,000.00 130,0�0.�� <br /> so r�oBtuz��-�or� LSUM � 50,000.00 50,000.00 <br /> 8'I V1�ATERMAIN 70 BE FILLEQ,6 fNCH !F 7Q0 1�'�� 7,000.00 <br /> 6� ALTERa4TfON5,.CAtJCEl.LATIONS, (.SUM i �r� ��(�d� �5,0��.0� � <br /> EXTENSI4NS,DEDUCTtQNS ANn EXTRA — <br /> WdRK <br /> 2,624,752.00 <br /> 7(7TAL BiD <br /> AC3D-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.