My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-07 Ordinance Amending PD Planned Development District Generally Bounded by East Marietta Street, North Water Street, East Wabash Avenue and Martin Luther King Jr. Drive Community Care Campus
COD
>
City Clerk
>
ORDINANCES
>
2019
>
2019-07 Ordinance Amending PD Planned Development District Generally Bounded by East Marietta Street, North Water Street, East Wabash Avenue and Martin Luther King Jr. Drive Community Care Campus
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 11:12:40 AM
Creation date
3/7/2019 1:56:42 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2019-07
Res Ord Title
2019-07 Ordinance Amending PD Planned Development District Generally Bounded by East Marietta Street, North Water Street, East Wabash Avenue and Martin Luther King Jr. Drive Community Care Campus
Department
Econ and Com Dev
Approved Date
3/4/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� �M <br /> � � ' <br /> 1. The permitted uses in this Planned Development District for a community care <br /> campus shall include health care center, food pantry, early childhood development <br /> center, outpatient medical/healthcare facility, inpatient medical/healthcare facility, <br /> dormitory for temporary patients, medical and professional offices, detox/residential <br /> rehabilitation facility, community gardens, apartments and accessory uses including <br /> but not limited to apartments for patients as approved by the Department of Economic <br /> and Community Development. <br /> 2. Provide traffic analysis to determine if improvements will be needed to the <br /> intersections of Water Street with King Street and Martin Luther King Jr. Drive with <br /> King Street. IDOT approval must be received for any changes within the North Water <br /> Street right-of-way. <br /> 3. A maximum of eight percent(8%) reduction in the required overall number of <br /> parking spaces is allowed. Bicycle racks shall be provided in appropriate locations <br /> for employees and patients. <br /> 4. The access drive parking lot for the apartment buildings north of East King Street and <br /> the access drive to the parking lot south of East King Street serving the four buildings <br /> must be aligned. <br /> 5. A maximum of ten (10) buildings, the existing Crossing Healthcare medical care <br /> facility included, shall be allowed within this Planned Development District, with a <br /> combined total square footage not to exceed 161,000 square feet. No building shall <br /> exceed 32,000 sq. ft. in size. All buildings shall be one-story in height, wi#h the <br /> exception of the dormitory and apartme�ts which may be two-story. <br /> 6. Building elevations and construction materials primarily of masonry for all permitted <br /> buildings shall be as approved by the Department of Economic and Community <br /> Development in conjunction with the final site plan review. <br /> 7. The overall development will be permitted to have no more than three (3) freestanding <br /> monument style signs —one (1) along the frontage of East Central Avenue and North <br /> Water Street,one(1)near the intersection of East King Street and North Warren Street, <br /> and one (1)along Martin Luther King Jr. Drive frontage. Wayfinding signs should not <br /> exceed four(4) square feet in area and shall not exceed three (3) feet in height each. <br /> 8. Al� lights facing residential uses shall be shielded. <br /> 9. Walking trails, decorative 6-foot high perimeter fencing, landscaped berms, <br /> community gaxdens, and orchards shall be provided as approved on the final site plan. <br /> 10. Sustainability features should be explored an�l provided as much as possible for the <br /> development of the subject site. <br /> 11. A four-lot final subdivision plat will be required to be submitted, approved and <br /> recorded prior to a final site plan being approved. <br /> 12. Reciprocal cross-access and cross-parking easements shall be provided as approved on <br /> the final site plan/subdivision plats and recorded with Macon County Recorder of <br /> Deeds. <br /> 13. Final site, landscaping/decorative fencing, and lighting plans shall be submitted to and <br /> approved by the Economic and Community Development Department, Public Works <br /> Department and the Fire Department prior to building permits being released <br />
The URL can be used to link to this page
Your browser does not support the video tag.