Laserfiche WebLink
2018 Lake Office Parking and Pier Improvements <br /> City Project 2018-36 <br /> January 18,2019 <br /> ADDENDUM NO. 1 <br /> TO PLANS,SPECIFICATIONS AND CONTRACT DOCUMENTS FOR: <br /> LAI�E OFFICE PARKING AND PIER IMPROVEMENTS <br /> CITY PROJECT 2018-36 <br /> DATED JANUARY 2019 <br /> AD-1-1 NOTICE <br /> 1.01 This Addendum No. 1 dated January 18, 2019, to the Plans, Specifications <br /> and Contract Documents for the above captioned project, supersedes all <br /> contrary and conflicting information of the above-mentioned bid proposal <br /> documents, which are hereby supplemented in certain particulars as <br /> follows: <br /> AD-1-2 BID PROPOSAL <br /> 2.01 Insert the attached pre-bid meeting sign-in sheet and meeting minutes <br /> from the Pre-Bid meeting on January 16, 2019. <br /> 2.02 Replace the Subcontractor Utilization Statement on Page 18 with the <br /> Subcontractor Utilization Statement included with this addendum. <br /> AD-1-3 STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE <br /> CONSTRUCTION <br /> 3.01 The following shall be�e�and added from Section 108.01 of the <br /> Standard Specification for Road and Bridge Construction. <br /> 108.01 Subcontracting. The con#ractor shall not subcontract, sell,transfer, <br /> assign, or otherwise dispose of the contract or any portion thereof, or of <br /> his/her right,title, or interest therein,without written consent of the <br /> Engineer. Notwithstanding consent to subcontract approved by the <br /> Engineer,the Contractor shall perform with the Contractor's own <br /> organization,work to not less than�8 25 percent of the total contract cost, <br /> and with materials purchased or produced by the Contractor. <br /> Please make the proper acknowledgment of addenda#1 on page 15 of your <br /> bidding documents. <br /> END OF ADDENDUM NO. 1 <br /> City Engineer: i�� Date: �/ ���� ` <br />