My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2019-59 Resolution Authorizing an Agreement with the State of Illinois for Improvements to U.S. 36 (Eldorado Street) from Fairview Avenue to Church Street, City Project 2019-32
COD
>
City Clerk
>
RESOLUTIONS
>
2019
>
R2019-59 Resolution Authorizing an Agreement with the State of Illinois for Improvements to U.S. 36 (Eldorado Street) from Fairview Avenue to Church Street, City Project 2019-32
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 11:12:40 AM
Creation date
4/17/2019 3:14:49 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2019-59
Res Ord Title
R2019-59 Resolution Authorizing an Agreement with the State of Illinois for Improvements to U.S. 36 (Eldorado Street) from Fairview Avenue to Church Street, City Project 2019-32
Department
Public Works
Approved Date
4/15/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Limit of US 36 improvement to 95 Feet West of West Eldorado Street Intersection <br /> CITY owned utilities including appurtenances thereto and the highway lighting system, <br /> including lighting attached to the structure (SN 058-0127) over Fairview Avenue, and <br /> furnishing the electrical energy for the entire highway lighting system. <br /> 95 Feet West of West Eldorado Street Intersection to East Limit of Improvement <br /> Sidewalks, parkways, crosswalk and sfopline markings, CITY owned utilities including <br /> appurtenances thereto and highway lighting including furnishing the electrical energy <br /> therefore. The CITY further agrees to continue its existing maintenance responsibilities <br /> on all side road approaches under its jurisdiction, including all left and right turn lanes on <br /> said side road approaches, up to the through edge of pavement of FAP 323 (U.S. 36). <br /> The CITY shall continue maintenance of the storm sewers and appurtenances by <br /> performing those functions necessary to keep the sewer in a serviceable condition <br /> including cleaning sewer lines, inlets, manholes and catch basins along with the repair or <br /> replacement of inlet, manhole and catch basin frames,grates or lids plus structural failures <br /> to a maximum length of 12 feet between adjacent manholes. The maintenance, repair <br /> and/or reconstruction of storm sewers constructed as part of this improvement beyond the <br /> aforedescribed responsibilities shall be that of the STATE. Drainage facilities, if any, at <br /> the aforementioned side roads located within the STATE right-of-way shall be the joint <br /> maintenance responsibility of the STATE and the CtTY unless there is an agreement <br /> specifying different responsibilities. <br /> 14. Upon acceptance by the STATE of the traffic signal work included herein the responsibiiity <br /> for maintenance and energy shall continue to be as outlined in the Master Agreement <br /> executed by the STATE and the CITY on July 1, 2011. <br /> 15. The STATE agrees to make a�rangements with the local power company to furnish the <br /> electrical energy for the operation of the traffic signals. The CITY agrees to pay their <br /> proportionate share of this cost as billed by the local power company. <br /> -7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.