My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2019-75 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Dunn Company, A Division of Tyrolt, for Annual Street Restoration City Project 2019-08
COD
>
City Clerk
>
RESOLUTIONS
>
2019
>
R2019-75 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Dunn Company, A Division of Tyrolt, for Annual Street Restoration City Project 2019-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 11:12:39 AM
Creation date
5/23/2019 5:27:26 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2019-75
Res Ord Title
R2019-75 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Dunn Company, A Division of Tyrolt, for Annual Street Restoration City Project 2019-08
Department
Public Works
Approved Date
5/20/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDEX FOR <br /> GENERA.L CONAiTIONS <br /> SPECIAL PROVISIUNS <br /> SUPPLEMENT.AL SPECIFICATIONS <br /> Index............................................................................................................1 <br /> GENERAL CONDITIONS <br /> GC-1 Permits...............................................................................................2 <br /> GC-2 Phatflgraphs of Existing Conditions..................................................2 <br /> GC-3 Use of Fire Hydrants..........................................................................2 <br /> GC-4 Utitities...............................................................................................2 <br /> GC-5 Methad of Payment............................................................................3 <br /> GG6 Prevailing Wage Rates.......................................................................3 <br /> SPECIAL PROVISICINS <br /> SP-1 Description of Work............................................................................4 <br /> SP-2 Construction Schedule and Completian I7ate.....................................4 <br /> SP-3 Hot Mix Asphalt Mixture Requirements.............................................4 <br /> SP-4 Truck Loading to Reduce Mix Segregatian........................................4 <br /> SP-5 F3ituminous Materials(Tack Coat)......................................................5 <br /> SP-6 Traffic Contro3 ..........................................................................5 and 6 <br /> SP-7 Restoration and Seeding......................................................................6 <br /> 5P-8 Sediment Control and Inlet Protection................................................6 <br /> SP-9 Sched�ale of Work................................................................................b <br /> SP-]0 Pavement Striping.............................................................................7 <br /> SP-11 Wark Near Railroads.........................................................................7 <br /> SP-12 Ctass D Patches and Crack Filling....................................................7 <br /> SP-13 Grand Avenue Curb, Sidewalk,and Pipe Underdrain......................7 <br /> SUPPLEMENTAL SFECIFICATIONS <br /> Section 107 Legal Regulatians and Responsibility to the Public................$ <br /> Section 440 Removal of Existing Pavement and Appurtenances..........9-lp <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.