Laserfiche WebLink
Technical senrfces for server build,ensure cammunications are working,conned to the message switch,and configure with mobile <br /> communications. <br /> QA services for application suppod and configuraUoo to oiher apptications. <br /> Also ineludes Maintenance Training and the instaAation of the digital dispatchlMobile Field Reporting appltcation software on up to <br /> five(5y mobile computers. <br /> Part Number.MCT-SWI-IMPL <br /> Price:57400 <br /> DescripUon:IMPLEMENTATION OF BASE MESSAGE SWITCH <br /> Long Description:One(1)day of lechnkal services W conflgure for Stata Acoess and to condud Maintenance Traintng. <br /> Pa�t Number.MCT-SWI-INST <br /> Desc�ipNon:INSTALlATION OF BASE MESSAGE SWITCH <br /> Long Description:Installation artd setup oi SunGard Public Sectors Base Message Switch applfcation soitware. <br /> The Message Switch must run on Windows Z000 Server w hfgher. <br /> Part Numbe�AACT IMPL <br /> DescripUon:MOBILE IMPLEMENTATION SERVICES <br /> Lang Desr.ription:SunGard PubUc Sedor technical senrices for MCT systemldata verificat�n after the system administrator training <br /> and lhe code taWes are bu�t. This i�dudes a SunGard Public Sector representative on site the day ARCT goes live. <br /> � Includes on-site Technical Servkes;QA t�ting prior to user training;and o�-site go-lnre. <br /> PaR Number.MFR-MNT-TRN <br /> Description:MOBILE FIELD REPORTING AAAINTENANCE TRAINING <br /> Long Desc�iption:Training for system administrators and key personnel(4-B peopte max.)responslble for system configuration <br /> ({nduding setting codes reflecting agency business pracNces)and maintenance. Topics indude setting up the MFR appllcatbn on <br /> the server and laptops,report submission and approval,and key InteracNons wlth RMS. Gass durallon=up to 1 day. <br /> Part Number:MCT-TTT-TRN <br /> Oescription:MCT TRAIN THE TRAINER TRAINING <br /> Long Descxfption:Four{4}days of on-site training ass�tance destgned to prepare agency training staff for conducting MCT User <br /> T�aining. OSSI Training SpedaGst provides one(1)day of set-up,one(1)day of instruction on MCT followed by two(2)days of <br /> consufting,induding obsenring and providing feedbadc to agency traine�s. <br /> PaR Number.MFR-TTT-TRN <br /> Descriptlon:MOBILE FIELD REPORT{NG TRAIN TNE TRAINHR TRAINING <br /> Long Desufption:Seven(7)days of on-site tratntng and assistance designed Oo prepa�e agency traEnfng staff for conducting MFR <br /> User Training. OSSI Training SpeciaGst provhles a�e(1)day of set-up,three(3)days of instruction on MFR foltowed by three(3) <br /> days of wnsulting,induding observing and providing feedbadc to agency traEners. <br /> PaR Numbar.MFR-INST <br /> OescriptEon:INSTALLATION MOBILE FIEI.�REPORTING <br /> Long Description:Two(2j days of QA services to install aRd conflgure OSSI MFR I�c�udes install and configuration ot add on <br /> modules. <br /> Part Number:MFR-IMPL <br /> DescriptEon:IMPLEMENTATIQN FOR MOBILE FIELD REPORTING <br /> Long Desc�iption:QA services ta test OSSI MFR. <br /> PaR Number.MCT-ADD-TRN <br /> Descriptlon:MCT 8 MFR ADD ON AAODULE USER TRAINING <br /> Long Descrfptfon:Training for MCT and MFR Add-on M1Ilodules to Endude: <br /> One(1)day of Accldent Reporting <br /> PaR Number.RMS-BASE-75 <br /> Descrfption:BASE RECORDS AAANAGEMENT SYSTEM-75 WORKSTATION <br /> Long Description:SunGard Public Sedors Cllent Server Version of RMS(reguires Micxosoft's Windows 2000 Senrer or higher� <br /> inGudes: <br /> InddenUOf(ense Module <br /> CrimeMatch Reporting <br /> Arcest Modu�e <br /> Warcents Module <br /> UCR Property Management <br /> Master Name Module <br /> Master Vehide Module <br /> Page 17 of 26 <br /> fiPS Lloense 7/1@010 <br />