Laserfiche WebLink
6/7/2019 Item Coversheet <br /> '� . <br /> Public Works <br /> DATE: 6/7/2019 <br /> MEMO: 2019-48 <br /> TO: Honorable Mayor Moore Wolfe and City Council Members <br /> FROM: Scot Wrighton,City Manager <br /> Matthew Newell,P.E.,Public Works Director <br /> Keith Alexander,Water Producrion Manager <br /> SUBJECT: Resolution Authorizing a Professional Services Agreement with Hanson Professional Services Inc. for Lake Decatur <br /> Dam Gates Evaluation <br /> SUMMARY RECOMMENDATION: Council adopt the attached Resolution Authorizing a Professional Services Agreement , <br /> with Hanson Professional Services Inc. for Lake Decatur Dam Gates Evaluation for a fee not to exceed$153,900. <br /> BACKGROUND: <br /> On Monday,December 10,2018,while operating the Lake Decatur dam bascule gates,the north bascule gate failed to raise from <br /> its full down position. The bascule gates are the long gates that span the top of the dam. Large hydraulic pistons lower or raise the <br /> gates as needed to allow water to flow over the dam to maintain the necessary lake depth. This failure created a 24-hour period <br /> during which a considerable amount of water flowed uncontrolled out of the lake. The lake lost nearly 2'of water overnight. On <br /> Tuesday,December 11,the gate finally responded to repeated activation attempts and was raised to its full up position. Since then, <br /> we have not lowered the north gate below its 60%up position. � <br /> It is believed that one of the four hydraulic pistons that power the north bascule gate seized for some reason. However,there could <br /> also be other explanations,including debris blocking the front of the gate which sits underwater out of sight of normal inspection. <br /> With the summer weather approaching and hopefully reduced Sangamon River water flow,the Public Works Department proposes <br /> to retain the services of Hanson Professional Services to review the bascule gates including the hydraulic cylinders to determine <br /> the cause of the December failure and recommend necessary repairs. <br /> Hanson Professional Services has provided Lake Decatur dam engineering and repair services to the City for the past 15 years. <br /> Since they are the firm that is most familiar with the dam,and located nearby in Springfield,they were contacted to provide the <br /> proposed bascule gates evaluation. Hanson has assembled a turnkey operation to perform the inspections. Their team inc�udes � <br /> Christy Foltz,a respected local contractor who will provide the necessary equipment to access the gates and hydraulic cylinders. <br /> Underwater inspection of the front face of the bascule gates will be performed by Global Infrastructure who completed the last <br /> major rehab of the bascule gates and has provided underwater inspections of the upstream face of the dam in the past. Hydraulic. <br /> review and testing of the system will be conducted by John Henry Foster,a firm that currently services the dam hydraulic systems. , <br /> The evaluation is complex and encompassing in order to determine the problem and its likely cause. The scope of work is ' <br /> composed of four major task: <br /> 1.Hydraulic Cylinder Testing-A118 hydraulic cylinders,encompassing both the north and south bascule gates will be tested to <br /> assure that there are no other lurking problems with the large pistons. ' <br /> 2.Gate Inspection-Both bascule gates will be examined for possible damage. This will include the use of divers to inspect the <br /> upstream face of the gates. <br /> 3.Upstream Face of the Dam Inspection-With divers mobilized at the site,we will have them inspect the upstream(lalce side) <br /> face of the entire dam. This portion of the dam has not had an underwater inspection in approximately 15 years. � <br /> 4.Preparation of a Summary Report and Recommendations-This will include the likely cause of the December gate failure and <br /> specify the follow-up work necessary to design the necessary repairs. <br /> Task details are on page A-1 through A-3 of the agreement. <br /> https://decatur.novusagenda.coMAgendaWeb/CoverSheet.aspx?ItemID=2070 1�2 , <br />