-2- <br /> Hanson Professionai Services has provided Lake Decatur dam engineering and repair services to <br /> the City for the past 15 years. Since they are the firm that is most familiar with the dam, and <br /> located nearby in Springfield,they were contacted to provide the proposed bascule gates <br /> evaluation. Hanson has assembled a turnkey operation to perform the inspections. Their team � <br /> includes Christy Foltz, a respected local subcontractor who will provide the necessary equipment <br /> to access the gates and hydraulic cylinders. Underwater inspection of the front face of the <br /> bascule gates will be performed by Global Infrastructure who completed the last major rehab of <br /> the bascule gates and has provided underwater inspections of the upstream face of the dam in the � <br /> past. Hydraulic review and testing of the system will be conducted by John Henry Foster, a firm � <br /> that currently services the dam hydraulic systems. <br /> The evaluation is complex and encompassing in order to determine the problem and its likely ' <br /> cause. The scope of work is composed of four major tasks: <br /> 1. Hydraulic Cylinder Testing—All 8 hydraulic cylinders, encompassing both the north and <br /> south bascule gates will be tested to assure that there are no other lurking problems with � <br /> the large pistons. <br /> 2. Gate Inspection—Both bascule gates will be examined for possible damage. This will <br /> include the use of divers to inspect the upstream face of the gates. <br /> 3. Upstream Face of the Dam Inspection—With divers mobilized at the site,we will have <br /> them inspect the upstream (lake side) face of the entire dam. This portion of the dam has <br /> not had an underwater inspection in approximately 15 years. <br /> 4. Preparation of a Summary Report and Recommendations. This will include the likely <br /> cause of the December gate failure and specify the follow-up work necessary to design , <br /> the necessary repairs. <br /> Task details are on pages A-1 through A-3 of the agreement. <br /> BUDGET/TIME IMPLICATIONS: The services are not to exceed $153,900 and will be paid , <br /> from the Water Lake Capital Fund. These services need to be performed when the air <br /> temperature is well above freezing and water is not flowing over the dam, which is typically <br /> during the summer and fall months. � <br /> POTENTIAL OBJECTION: None foreseen. <br /> INPUT FROM OTHER SOURCES: ' <br /> The following City staff reviewed and approved the agreement in May: <br /> Gregg Zientara, Director of Financial Management <br /> Wendy Morthland, Corporation Counsel <br /> STAFF REFERENCE• <br /> Matt Newell, Public Works Director, Keith Alexander, Water Production Manager. Matt Newell <br /> will be in attendance at the City Council meeting to answer any questions of the Council on this <br /> item. <br />