Laserfiche WebLink
LoCal PubliC AgenCy State Contract Day Labor Local Contract RR Force Account <br /> �rs�� Ilfinois Department <br /> `� of TranSportafion City of Decatur X <br /> Local Public Agency Agreement Section Fund Type ITEP,SRTS,or HSIP Number(s) <br /> for Federal Participation 09-00933-01-BR NHFP <br /> Construction En ineerin Ri ht-of-Wa <br /> Job Number Project Number Job Number Project Number Job Number Project Number <br /> R-97-006-19 D481(568) <br /> This Agreement is made and entered into between the above local public agency,hereinafter referred to as the"LPA",and the State of <br /> Illinois,acting by and through its Department of Transportation, hereinafter referred to as"STATE". The STATE and LPA jointly <br /> propose to improve the designated location as described below. The improvement shall be constructed in accordance with plans <br /> prepared by,or on behalf of the LPA,approved by the STATE and the STATE's policies and procedures approved and/or required by <br /> the Federal Highway Administration, hereinafter referred to as"FHWA". <br /> Location <br /> Local Name Brush College Road Route FAU 7448 Length 0.01 mi. <br /> Termini Over Faries Parkway and NorFolk Southern Railroad <br /> Current Jurisdiction City of Decatur TIP Number DEC19-09 Existing Structure No n/a <br /> Project Description <br /> Utility Relocation and purchase of SJ Smith Property <br /> Division of Cost <br /> Type of Work NHFP % % LPA % TOtal <br /> Participating Construction ( ) � � � � <br /> Non-Participating Construction ( ) ( � � � <br /> Preliminary Engineering ( ) � � � � <br /> Construction Engineering ( ) � � � � <br /> Right of Way 1,600,000 ( " ) ( ) 400,000 ( BAL ) 2,000,000 <br /> Railroads ( � � � � � <br /> Utilities 2,000,000 ( * ) ( ) 2,818,000 ( BAL ) 4,818,000 <br /> Materials <br /> TOTAL $ 3,600,000 $ $ 3,218,000 <br /> $ 6,818,000 <br /> *80%NHFP funding NTE$3,600,000 <br /> NOTE: The costs shown in the Division of Cost table are approximate and subject to change. The final LPA share is dependent on the final Federal <br /> and State participation. The actual costs will be used in the final division of cost for billing and reimbursment. <br /> If funding is not a percentage of the total,place an asterisk in the space provided for the percentage and explain above. <br /> Local Public Agency Appropriation <br /> By execution of this Agreement,the LPA attests that sufficient moneys have been appropriated or resenred by resolution or ordinance <br /> to fund the LPA share of project costs. A copy of the authorizing resolution or ordinance is attached as an addendum(required for <br /> State-let contracts only) <br /> Method of Financing(State Contract Work Only) <br /> METHOD A---Lump Sum (80%of LPA Obligation) <br /> METHOD B--- Monthly Pavments of due by the of each successive month. <br /> METHOD C---LPA's Share divided by estimated total cost multiplied by actual proqress payment. <br /> (See page two for details of the above methods and the financing of Day Labor and Local Contracts) , <br /> Exhibit A <br /> Printed 8/13/2079 Page 1 of 5 BLR 05310(Rev.01/29/18) <br />