My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2019-122 Resolution Authorizing a Professional Engineering Services Agreement with AECOM Technical Services Inc, to Perform Bridge Repair Design Services for the West Mound Road Bridge over Stevens Creek, SN 058-3062 City Project 2019-33
COD
>
City Clerk
>
RESOLUTIONS
>
2019
>
R2019-122 Resolution Authorizing a Professional Engineering Services Agreement with AECOM Technical Services Inc, to Perform Bridge Repair Design Services for the West Mound Road Bridge over Stevens Creek, SN 058-3062 City Project 2019-33
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 11:12:35 AM
Creation date
9/5/2019 8:35:50 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
Resolution
Res Ord Title
R2019-122 Resolution Authorizing a Professional Engineering Services Agreement with AECOM Technical Services Inc, to Perform Bridge Repair Design Services for the West Mound Road Bridge over Stevens Creek, SN 058-3062 City Project 2019-33
Department
Public Works
Approved Date
9/3/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> City of Decatur 2019 Substructure Repair Plans-W. Mound Rd.over Stevens Creek SN 058-3062 <br /> Section 19-00933-00-BR /! ""'"'/�'4/°'�►�/ <br /> Summary-Engineering Manhour&Fee Estimate t'l.ir����ri�,�/1TE <br /> City of Decatur 2019 Substructure Repair Ptans-W. Mound Rd.over Stevens Creek SN 058-3062 <br /> Labor Direct Cost of Total °/, <br /> Task No. Description Manhours <br /> Costs Costs Subs Cost of Total <br /> 3062-1 Inspection & Repair Plans 226.0 $27,191.76 $256.36 $0.00 $27,448.12 91.55% <br /> 3062-2 Project Administration& Management 16.0 $2,534.50 $0.00 $0.00 $2,534.50 8.45°/a <br /> Totals 242.0 $29,726.26 $256.36 $0.00 $29,982.62 100.00% <br /> *With 2.74 multiplier <br /> TOTAL CONTRACT FEE(Time �Materiats-Not To Exceed)_ $29,990� <br /> Tasks& Manhours 058-3062.x1s Rev 0-8/21/19 A_2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.