My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2019-131 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Reyhan Bro, Inc. DBA: Sangamo Construction Company, for the Main Street Bridge over Stevens Creek Bridge Repair for City Project 2018-02
COD
>
City Clerk
>
RESOLUTIONS
>
2019
>
R2019-131 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Reyhan Bro, Inc. DBA: Sangamo Construction Company, for the Main Street Bridge over Stevens Creek Bridge Repair for City Project 2018-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 12:46:48 PM
Creation date
9/17/2019 5:29:30 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2019-131
Res Ord Title
R2019-131 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Reyhan Bro, Inc. DBA: Sangamo Construction Company, for the Main Street Bridge over Stevens Creek Bridge Repair for City Project 2018-02, Section No.
Department
Public Works
Approved Date
9/17/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' � RETURN WITH BtD <br /> ���QLS ���'me'I� SCHEDULE OF PRICES <br /> o� Tr�nsportafion <br /> County MACON <br /> Local Pubiic Agency CITY pF DECATUR <br /> SecGon 18-00802-00-BR <br /> Route FAU 7386�MAIN ST.) <br /> Scheduie for Muitiple Bids <br /> Combination Letter Sections included in Combina6ons Total <br /> Schedule for Single B1d <br /> (For comptete information covering ihese items,see plans and specifications) <br /> Bidder's Pro osal fo�makin Entire Im rovemenis <br /> ttem No. items Unit Quanti Unit Price Total <br /> 1 PC3RTLAND CEMENT CONCRETE SIDEWALK 5 INCH SQ Fi' 455.80 � <br /> 2 COMBINATION CURB AND GUTTER REMOVAL FOQT 39.OD <br /> 3 SIDEWRLK REMOVAL SQ FT 455.00 <br /> 4 TtE BARS 1/2" EAGH 16,00 2�.93 334.gg <br /> 5 SAW CUTS FOOT 49.00 <br /> 6 STRUCTUf2E EXCAVATION CU YD 115.00 <br /> 7 CONCRETE STRUCTURES CU YD 10.70 <br /> 8 STUD SHEAR GONNECTORS EACH 128.00 <br /> 9 REINF�RCEMENT BARS POUND i,240.00 <br /> 10 CONTROLLED LOW-STRENG7H MATERIAL CU YO 6fi_40 <br /> 11 CONCRETE IiEADWALLS FOR PIPE DRAINS EACH 4.00 <br /> 12 FRENCK DRAlNS CU YD 16.90 <br /> 13 GEOTECHNICAL FABR{C FOR FRENCH DRAlNS SQ YD 121.40 <br /> 14 PIPE DRAINS 4" FOOT 44.00 <br /> 15 COMBINATI4N CONCRETE GURB AND GUTfER,TYPE B-6.24 FOOT 39.00 <br /> 16 SEEDING,CLASS 2(SPECIAL} ACRE 0.50 <br /> 17 STONE RIPRAP,CLASS/�4(SPECIAL) : TON 84.00 <br /> 18 Tf2AFFIC CONTROL ANO PRO'fECTiON,(SPEGIAL) L SUM 1 <br /> 19 STRUCTURAL STEEL REPAIR PpUND 130.00 <br /> 2Q CLEANtNG STRUCTURAL STEEL L SUM 1 <br /> To-�..t B;d� �'t�o,35�,38 <br /> __-------- <br /> Printed 8/19l2019 Page 4-1 BLR 12200a{01/08/14) <br />
The URL can be used to link to this page
Your browser does not support the video tag.