Laserfiche WebLink
The proposed street list for rehabilitation is as follows (see attached location map): <br /> Street Begin End Surface Treatment Length (feet) Length <br /> Lane Miles <br /> W. lst Drive S.Main Street Franklin Street Mill and Overlay 1,018 0.39 <br /> Road <br /> E.Prairie N.Hilton Street N.Jasper Street Mill and Overlay 1,587 0.60 <br /> Street <br /> Total Length 2,605 0.99 <br /> The proposed locations for patching as part of the Street Restoration project are as follows: <br /> Street Location Length of <br /> road feet <br /> E.Hickory Point Road Between the old R.R.Right-of-Way and Sawyer Road 3,850 <br /> W. Mound Road Between IL Route 121 and N. Westlawn Avenue 1,570 <br /> Totat Length 5,420 <br /> The proposed locations for crack sealing as part of the Street Restoration roject are as follows: <br /> Street Location Length of <br /> road feet <br /> E.Mound Road Between Constant View Drive and IL Route 48 11,780 <br /> N.Jasper Street Between E. Sangamon Street and E. Condit Street 1,500 <br /> Total Length 13,280 <br /> SCHEDULE: <br /> Design work for the 2020 Street Restoration Project is underway and the plans are currently being <br /> reviewed by IDOT. The project is planned to begin around the month of June. <br /> BUDGET/TIME IMPLICATION: <br /> l. Budget Impact: The proposed resolutions appropriate $650,000 in State Motor Fuel Tax funds <br /> for the Street Restoration project. <br /> 2. Staffing Impact: Staff time has been allocated for managing these projects. <br /> LEGAL REVIEW: Legal review of the State Motor Fuel Tax appropriation is not required. <br /> POTENTIAL OBJECTION: There are no known objections to this resolution. <br /> INPUT FROM OTHER SOURCES: Illinois Department of Transportation <br /> STAFF REFERENCE: Matt Newell, Public Works Director, Paul Caswell, City Engineer and <br /> Griffin Enyart, Assistant City Engineer. Matt Newell will be in attendance at the City Council <br /> meeting to answer any questions of the Council on this item. <br /> This memorandum was prepared Yyy Griffin Enyart, P.E., Assistant City Engineer. <br /> Attach: 3 <br /> �2� <br />