My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2019-208 Resolution to Appropriate Motor Fuel Tax Funds for Restoration of Streets and Highways by Municipality Under the Illinois Highway Code City Project 2020-08
COD
>
City Clerk
>
RESOLUTIONS
>
2019
>
R2019-208 Resolution to Appropriate Motor Fuel Tax Funds for Restoration of Streets and Highways by Municipality Under the Illinois Highway Code City Project 2020-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 12:46:48 PM
Creation date
12/17/2019 5:38:21 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2019-208
Res Ord Title
R2019-208 Resolution to Appropriate Motor Fuel Tax Funds for Restoration of Streets and Highways by Municipality Under the Illinois Highway Code City Project 2020-08
Department
Public Works
Approved Date
12/16/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The proposed street list for rehabilitation is as follows (see attached location map): <br /> Street Begin End Surface Treatment Length (feet) Length <br /> Lane Miles <br /> W. lst Drive S.Main Street Franklin Street Mill and Overlay 1,018 0.39 <br /> Road <br /> E.Prairie N.Hilton Street N.Jasper Street Mill and Overlay 1,587 0.60 <br /> Street <br /> Total Length 2,605 0.99 <br /> The proposed locations for patching as part of the Street Restoration project are as follows: <br /> Street Location Length of <br /> road feet <br /> E.Hickory Point Road Between the old R.R.Right-of-Way and Sawyer Road 3,850 <br /> W. Mound Road Between IL Route 121 and N. Westlawn Avenue 1,570 <br /> Totat Length 5,420 <br /> The proposed locations for crack sealing as part of the Street Restoration roject are as follows: <br /> Street Location Length of <br /> road feet <br /> E.Mound Road Between Constant View Drive and IL Route 48 11,780 <br /> N.Jasper Street Between E. Sangamon Street and E. Condit Street 1,500 <br /> Total Length 13,280 <br /> SCHEDULE: <br /> Design work for the 2020 Street Restoration Project is underway and the plans are currently being <br /> reviewed by IDOT. The project is planned to begin around the month of June. <br /> BUDGET/TIME IMPLICATION: <br /> l. Budget Impact: The proposed resolutions appropriate $650,000 in State Motor Fuel Tax funds <br /> for the Street Restoration project. <br /> 2. Staffing Impact: Staff time has been allocated for managing these projects. <br /> LEGAL REVIEW: Legal review of the State Motor Fuel Tax appropriation is not required. <br /> POTENTIAL OBJECTION: There are no known objections to this resolution. <br /> INPUT FROM OTHER SOURCES: Illinois Department of Transportation <br /> STAFF REFERENCE: Matt Newell, Public Works Director, Paul Caswell, City Engineer and <br /> Griffin Enyart, Assistant City Engineer. Matt Newell will be in attendance at the City Council <br /> meeting to answer any questions of the Council on this item. <br /> This memorandum was prepared Yyy Griffin Enyart, P.E., Assistant City Engineer. <br /> Attach: 3 <br /> �2� <br />
The URL can be used to link to this page
Your browser does not support the video tag.