Laserfiche WebLink
Bureau of Design and Environment <br /> Prepared By: Consultant <br /> PAYROLL RATES <br /> FIRM NAME Quigg Engineering DATE 08/21/20 <br /> PRIME/SUPPLEMENT Supplement-1 <br /> PTB-ITEM# 100 <br /> ESCALATION FACTOR 3.00% <br /> Note:Rates should be capped on the AVG 1 tab as necessary <br /> IDOT <br /> CLASSIFICATION PAYROLL RATES CALCULATED RATE <br /> ON FILE <br /> Admin Principal $62.65 $64.53 <br /> Engineer VI $73.67 $75.88 <br /> Engineer V $64.65 $66.59 <br /> Engineer IV $50.07 $51.57 <br /> Engineer III $37.07 $38.18 <br /> Engineer II $30.66 $31.58 <br /> Engineer 1 $27.45 $28.27 <br /> Technician V $41.62 $42.87 <br /> Technician IV $37.50 $38.63 <br /> Technician III $27.59 $28.42 <br /> Technician II $20.92 $21.55 <br /> Technician 1 $17.33 $17.85 <br /> Surveyor V $56.00 $57.68 <br /> Surveyor IV $44.50 $45.84 <br /> Surveyor 111 $36.80 $37.90 <br /> Surveyor 11 $22.00 $22.66 <br /> Surveyor 1 $17.62 $18.15 <br /> Admin Assistant $15.66 $16.13 <br /> Printed 8/21/2020 10:32 AM Page 2 of 5 BIDE 3608 Template(Rev. 10/19/17) <br />