My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2020-119 Resolution Authorizing City of Decatur Supplement #1 to the Professional Engineering Services Agreement Between the City of Decatur and AECOM for Design Services for the Improvement of Brush College Road over Faries Parkwa
COD
>
City Clerk
>
RESOLUTIONS
>
2020
>
R2020-119 Resolution Authorizing City of Decatur Supplement #1 to the Professional Engineering Services Agreement Between the City of Decatur and AECOM for Design Services for the Improvement of Brush College Road over Faries Parkwa
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 12:46:47 PM
Creation date
9/14/2020 10:45:22 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2020-119
Res Ord Title
R2020-119 Resolution Authorizing City of Decatur Supplement #1 to the Professional Engineering Services Agreement Between the City of Decatur and AECOM for Design Services for the Improvement of Brush College Road over Faries Parkway
Department
Public Works
Approved Date
9/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/8/2020 Coversheet <br /> Public Works <br /> DATE: 9/3/2020 <br /> MEMO: 2020-122 <br /> TO: Honorable Mayor Julie Moore Wolfe and City Council Members <br /> FROM: Scot Wrighton,City Manager <br /> Matthew C.Newell,P.E.,Public Works Director <br /> SUBJECT: <br /> Resolution Authorizing City of Decatur Supplement#1 to the Professional Engineering Services Agreement Between the <br /> City of Decatur and AECOM for Design Services for the Improvement of Brush College Road over Faries Parkway and the <br /> Norfolk Southern Railroad Tracks,City Project 2009-33.Section 09-00933-01-BR. <br /> SUMMARY RECOMMENDATION: <br /> It is recommended that the City Council approve the attached Resolution authorizing the Mayor to sign and the City Clerk to attest. <br /> The City Resolution authorizing Supplement 41 to the professional engineering services agreement between the City of Decatur and AECOM Technical <br /> Services,Inc.,(AECOM)is for the entire project scope and design,as discussed on August 31 for the Brush College Road/Faries Parkway railroad grade <br /> separation project. The supplemental fee is$576,078 for a total design fee of$3,925,745,with$3,350,000 being reimbursed by the Freight Program <br /> ($2,400,000)and the Grade Crossing Protection Fund($950,000). As discussed at the August 31 study session,funding for the remainder($575,745)is <br /> expected to come from additional allocations from the State's Freight Program and the State/Federal Grade Crossing Protection Fund.Although the State has <br /> indicated a willingness to provide this funding,it has not yet been finalized,nor has the exact amount been determined.Finalizing this decision will likely take <br /> several months,and staff does not wish to put the design engineering on-hold in the meantime,as it will disrupt plans for a Spring project letting.It may be <br /> necessary to pay for portions off the design engineering that are not funded by the State/Federal governments from local Motor Fuel Tax Funds,(Section 09- <br /> 00933-01-BR),but this will be reconciled and authorized at a later date. <br /> BACKGROUND: <br /> On June 5,2018,the City received the announcement of the award of a$25 million grant through the Illinois Competitive Freight <br /> Program for the Brush College/Faries Parkway Grade Separation Project. On November 20,2017,the Illinois Commerce <br /> Commission informed the City that$12 million in Grade Crossing Protection Funds had been programmed for the construction of <br /> the Brush College Grade Separation. On January 21,2020,the Commission approved the release of$2,950,000 of the$12 million <br /> to fund engineering design services and utility relocation costs for the project. <br /> On October 1,2018,the City Council approved a professional engineering services agreement between the City of Decatur and <br /> AECOM Technical Services,Inc.,(AECOM)to perform design services for the Brush College Road/Faries Parkway railroad <br /> grade separation project for a fee of$3,349,667. This fee is being fully reimbursed by the awarded Freight Funds and Illinois <br /> Grade Crossing Protection Funds. <br /> The Project has progressed to the 60%design phase and is working toward a 95%design being completed in late September or <br /> early October. The 60%plans allowed a more accurate project estimate to be prepared which pegged the estimated project <br /> construction costs to be$42.48 million. This is a 67%increase over the estimate based on the initial project estimate based on the <br /> original 2013 preliminary estimate which was$25.35 million. The result is a$17.1 million funding gap which was discussed with <br /> the Council in a study session held on August 31St,2020. <br /> Amendment#1 to the Design Agreement <br /> The current contract value for AECOM's design agreement with the City is$3,349,667. Supplement#1 for$576,078 represents a <br /> 17%increase in the fee. Reasons for the requested fee increase include the following: <br /> 1.An additional 540'of roadway was added to the south end of the project. <br /> 2.Additional retaining wall designs are required with more stringent requirements. <br /> 3.The decision was also made to design the retaining walls to use increased seismic requirements for the retaining walls at <br /> the structure. <br /> hftps://decatur.novusagenda.com/agendapublietCoverSheet.aspx?ItemID=2976&MeetingID=260 1/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.